Download Print this page
Mercia Garden Products 0628LOG131-V3 General Instructions Manual

Mercia Garden Products 0628LOG131-V3 General Instructions Manual

Log cabin with return (3x4m)

Advertisement

Quick Links

General Instructions
0628LOG131-V3 Log Cabin With Return (3x4m)
0628LOG131-V3: T&G roof and oor
BEFORE YOU START PLEASE READ INSTRUCTIONS CAREFULLY
- Check the pack and make sure you have all the parts listed.
- When you are ready to start, make sure you have the right tools at hand (not supplied)
including a Phillips screwdriver, Stanley knife, wood saw, step ladder and drill with 2mm
bit.
- Ensure there is plenty of space and a clean dry area for assembly.
TIMBER
As with all natural materials, timber can be a ected during various weather conditions.
For the duration of heavy or extended periods of rain, swelling of the wood panels may
occur. Warping of the wood may also occur during excessive dry spells due to an interior
moisture loss. Unfortunately, these processes cannot be avoided but can be helped. It is
suggested that the outdoor building is sprayed with water during extended periods of
warm sunshine and sheltered as much as possible during rain or snow.
BUILDING A BASE
When thinking about where the building and base is going to be constructed:
Ensure that there will be access to all sides for maintenance work and annual
treatment.
Ensure the base is level and is built on rm ground, to prevent distortion. Refer to
diagrams for the base dimensions. The base should be slightly smaller than the external
measurement of the building, i.e. The cladding should overlap the base, creating a run
o for water. It is also recommended that the oor be at least 25mm above the
surrounding ground level to avoid ooding.
TYPES OF BASE
- Concrete 75mm laid on top of 75mm hard-core.
- Slabs laid on 50mm of sharp sand.
Whilst all products manufactured are made to the highest standards of Safety and in
the case of childrens products independently tested to EN71 level, we cannot accept
responsibility for your safety whilst erecting or using this product.
Refer to the instructions pages for your speci c product code
Please retain product label and instructions for future reference
All building's should be
erected by two adults
For ease of assembly, you
MUST pilot drill all screw
holes and ensure all screw
heads are countersunk.
2mm Drill bit
For ease of assembly use a
rubber mallet to t the log
boards. Do NOT use a heavy
hammer.
It is advisable to use a
circular saw when cutting
roof and oor boards.
For assistance please contact customer care on: 01636 821215
Mercia Garden Products Limited,
Sutton On Trent,
Newark,
Nottinghamshire,
NG23 6QN
www.merciagardenproducts.co.uk
Winter = High Moisture = Expansion
Summer = Low Moisture = Contraction
CAUTION
Every e ort has been made during the
manufacturing process to eliminate the
prospect of splinters on rough surfaces of the
timber. You are strongly advised to wear gloves
when working with or handling rough sawn
timber.
Ensure to measure and check before cutting
boards.
P 1

Advertisement

loading
Need help?

Need help?

Do you have a question about the 0628LOG131-V3 and is the answer not in the manual?

Questions and answers

Summary of Contents for Mercia Garden Products 0628LOG131-V3

  • Page 1 General Instructions Please retain product label and instructions for future reference 0628LOG131-V3 Log Cabin With Return (3x4m) Winter = High Moisture = Expansion All building’s should be 0628LOG131-V3: T&G roof and oor Summer = Low Moisture = Contraction erected by two adults...
  • Page 2 0628LOG131-V3 Please retain product label and instructions for future reference Overall Dimensions: Width = 4028mm Log Board - 28x120x2111mm QTY 6 Depth = 3139mm LB28-A-2111 Height = 2600mm Base Dimensions: Log Board - 28x120x2000mm QTY 6 Width = 3803mm LB28-A-2000...
  • Page 3 Please retain product label and instructions for future reference Veranda Post - 70x70x2001mm F7070-2001 (Notched) Fascia - 16x120x1601mm QTY 4 S16120-1601 (Angled) Fascia - 16x120x4032mm QTY 2 Felt Post Plate S16120-4032 Eaves Frame - 27x44x4000mm QTY 2 F2744-4000 Nail Bag Roof Board - 16x121x1600mm QTY 74 MB16-C-1600 70mm Bolt Set x16...
  • Page 4 Please retain product label and instructions for future reference Step 2 (See Pre-Assembly) IMPORTANT: Pre-drill before xing screws. Step 1 Parts needed - No. 6 QTY 1 Parts needed - No. 32 QTY 2 No. 7 QTY 1 No. 33 QTY 12 No.
  • Page 5 Please retain product label and instructions for future reference Step 3 (See Pre-Assembly) IMPORTANT: Pre-drill before xing screws. Step 4 Parts needed - No. 9 QTY 5 No. 10 QTY 6 Once you have laid 6 log boards (o No. 11 QTY 5 of the starter) up the door section, No.
  • Page 6 Please retain product label and instructions for future reference Step 5 (See Pre-Assembly) IMPORTANT: Pre-drill before xing screws. Step 6 Parts needed - No. 11 QTY 6 No. 13 QTY 6 Once you have laid the second No. 17 QTY 12 level of boards onto the assembly No.
  • Page 7 Please retain product label and instructions for future reference Step 7 (See Pre-Assembly) Step 8 IMPORTANT: Pre-drill before xing screws. Parts needed - No. 11 QTY 6 Parts needed - No. 37 QTY 18 No. 13 QTY 6 No. 17 QTY 12 Fix the Veranda Boards (No.
  • Page 8 Please retain product label and instructions for future reference Step 9 Step 11 (See Pre-Assembly) Parts needed - No. 39 QTY 1 Parts needed - No. 13 QTY 1 No. 25 QTY 1 No. 14 QTY 1 No. 36 QTY 1 Fix the top section of the post plate to the base of the post Following the same method...
  • Page 9 Please retain product label and instructions for future reference Step 15 (See Pre-Assembly) Step 13 (See Pre-Assembly) IMPORTANT: Pre-drill before xing screws. IMPORTANT: Pre-drill before xing screws. Parts needed - No. 20 QTY 1 Parts needed - No. 21 QTY 1 Keep adding the remaining Place the second Log Board (No.
  • Page 10 Please retain product label and instructions for future reference IMPORTANT: Pre-drill before xing screws. Step 17 (See Pre-Assembly) IMPORTANT: Pre-drill before xing screws. Step 18 Parts needed - No. 15 QTY 1 Parts needed - No. 23 QTY 2 No. 16 QTY 1 No.
  • Page 11 Please retain product label and instructions for future reference Step 19 Step 20 Parts needed - No. 29 QTY 74 Parts needed - No. 28 QTY 2 Place the rst two roof board’s Ensuring the roof boards are ush (No. 29) onto the assembly on at the overhanging side and meet each side, making sure the boards at the apex, x the eaves frames...
  • Page 12 Please retain product label and instructions for future reference Step 22 Step 21 Parts needed - No. 30 QTY 17 Parts needed - No. 30 QTY 1 No. 31 QTY 17 No. 31 QTY 1 Continue adding the oor boards To make the notches in the (No’s.
  • Page 13 Please retain product label and instructions for future reference Step 15 Roof Step 16 Parts needed - No. 34 QTY 7 Parts needed - No. 34 QTY 7 Inside the building place the closure Once the oor has been laid arrange the trim (No.
  • Page 14 Please retain product label and instructions for future reference Step 26 Step 25 Parts needed - No. 26 QTY 4 Parts needed - No. 38 QTY 1 Align the fascia’s (No. 26) Cut the felt (No. 38) into ve strips with the roof and x into and lay onto the roof in the order place using 3x40mm...
  • Page 15 Please retain product label and instructions for future reference Step 28 Parts needed - No. 35 QTY 8 Arrange the storm braces (No. 35) around the building (internally). It is ESSENTIAL that you apply wood treat- Place 2x storm braces per side ment immediately after the building has xing into place using 2x 70mm bolts per brace making sure the...