Download Print this page
Mercia Garden Products 0628LOG125-V4 General Instructions Manual

Mercia Garden Products 0628LOG125-V4 General Instructions Manual

4x4m 28mm apex cabin

Advertisement

Quick Links

General Instructions
0628LOG125-V4 (4x4m)
0628LOG125-V4: 4x4m 28mm apex cabin
BEFORE YOU START PLEASE READ INSTRUCTIONS CAREFULLY
- Check the pack and make sure you have all the parts listed.
- When you are ready to start, make sure you have the right tools at hand (not supplied)
including a Phillips screwdriver, Stanley knife, wood saw, step ladder and drill with 2mm
bit.
- Ensure there is plenty of space and a clean dry area for assembly.
TIMBER
As with all natural materials, timber can be a ected during various weather conditions.
For the duration of heavy or extended periods of rain, swelling of the wood panels may
occur. Warping of the wood may also occur during excessive dry spells due to an interior
moisture loss. Unfortunately, these processes cannot be avoided but can be helped. It is
suggested that the outdoor building is sprayed with water during extended periods of
warm sunshine and sheltered as much as possible during rain or snow.
BUILDING A BASE
When thinking about where the building and base are going to be constructed:
Ensure that there will be access (60cm) to all sides for maintenance work and annual
treatment.
Ensure the base is level and is built on rm ground, to prevent distortion. Refer to
diagrams for the base dimensions, The base should be slightly smaller than the external
measurement of the building, i.e. The cladding should overlap the base, creating a run
o for water. It is also recommended that the oor be at least 25mm above the
surrounding ground level to avoid ooding.
TYPES OF BASE
- Concrete 75mm laid on top of 75mm hard-core.
- Slabs laid on 50mm of sharp sand.
Whilst all products manufactured are made to the highest standards of Safety and in
the case of childrens products independently tested to EN71 level, we cannot accept
responsibility for your safety whilst erecting or using this product.
Refer to the instructions pages for your speci c product code
Please retain product label and instructions for future reference
All buildings should be
erected by two adults
For ease of assembly, you
MUST pilot drill all screw
holes and ensure all screw
heads are countersunk.
2mm Drill bit
For ease of assembly use a
rubber mallet to t the log
boards. Do NOT use a heavy
hammer.
It is advisable to use a hand
saw when cutting roof and
oor boards.
For assistance please contact customer care on: 01636 821215
Mercia Garden Products Limited,
Sutton On Trent,
Newark,
Nottinghamshire,
NG23 6QN
www.merciagardenproducts.co.uk
Winter = High Moisture = Expansion
Summer = Low Moisture = Contraction
CAUTION
Every e ort has been made during the
manufacturing process to eliminate the
prospect of splinters on rough surfaces of the
timber. You are strongly advised to wear gloves
when working with or handling rough sawn
timber.
Ensure to measure and check before cutting
boards.
To ensure log boards are even, use a spirit
level to check each layer has been installed
correctly.
P 1

Advertisement

loading
Need help?

Need help?

Do you have a question about the 0628LOG125-V4 and is the answer not in the manual?

Questions and answers

Summary of Contents for Mercia Garden Products 0628LOG125-V4

  • Page 1 General Instructions Please retain product label and instructions for future reference 0628LOG125-V4 (4x4m) 0628LOG125-V4: 4x4m 28mm apex cabin All buildings should be Winter = High Moisture = Expansion erected by two adults Summer = Low Moisture = Contraction BEFORE YOU START PLEASE READ INSTRUCTIONS CAREFULLY...
  • Page 2 0628LOG125-V4 Please retain product label and instructions for future reference Overall Dimensions: Width = 4110mm Log Board - 28x120x4800mm QTY 2 Depth = 5232mm LB28-AE-4800 Height = 2741mm Base Dimensions: Log Board - 28x120x5200mm QTY 2 Width = 3808mm LB28-AE-5200...
  • Page 3 Please retain product label and instructions for future reference Nail Bag Pre-assembly 70mm Bolt Set x16 30mm Screw x66 *Please note: Felt Tacks x600 70mm Screw x68 Each board interlocks at either end in a staggered pattern. 40mm Screw x602 Before securing ensure that the boards are tted properly in their respective tongues and grooves.
  • Page 4 Please retain product label and instructions for future reference Step 1 Step 2 IMPORTANT: Pre-drill before xing screws. Parts needed - No. 14 QTY 2 Parts needed - No. 14 QTY 11 No. 15 QTY 2 Arrange the remaining framing Lay the starters (No.
  • Page 5 Please retain product label and instructions for future reference IMPORTANT: Pre-drill before xing screws. Step 3 Step 5 Parts Needed - No. 4 QTY 2 No. 5 QTY 2 Once you have laid 6 log boards (o of the starter) up the door section, Place the starter boards (No.
  • Page 6 Please retain product label and instructions for future reference IMPORTANT: Pre-drill before xing screws. Step 7 Step 9 Parts needed - No. 5 QTY 1 Once you have laid the second No.11 QTY 2 level of boards onto the assembly No.
  • Page 7 Please retain product label and instructions for future reference Step 11 Step 12 IMPORTANT: Pre-drill before xing screws. Parts needed - No. 16 QTY 3 Parts needed - No. 12 QTY 94 Align the roof purlin(s) (No. 16) Place the rst two roof into the cut out slots on each gable top board’s (No.
  • Page 8 Please retain product label and instructions for future reference Step 13 Step 14 Parts needed - No. 13 QTY 34 Parts needed - No. 18 QTY 4 Place the rst oor board (No. 13) Ensuring the roof boards are ush inside the building ush to the log at the overhanging side and meet board on one side.
  • Page 9 Please retain product label and instructions for future reference Step 17 Step 15 Roof Parts needed - No. 22 Parts needed - No. 20 QTY 5 Cut the felt into ve strips and lay Inside the building place the closure trim (No.
  • Page 10 Please retain product label and instructions for future reference Step 18 Parts needed - No. 17 QTY 4 Align the fascia’s (No. 17) with the roof and x into place using 3x40mm screws per fascia, making It is ESSENTIAL that you apply wood to screw through the fascia into the roof purlins treatment immediately after the building...