Download Print this page

Mercia Garden Products 0628LOG136-V4 General Instructions Manual

28mm 4x4m corner cabin

Advertisement

Quick Links

General Instructions
0628LOG136-V4
0628LOG136-V4 28mm 4x4m corner cabin
BEFORE YOU START PLEASE READ INSTRUCTIONS CAREFULLY
- Check the pack and make sure you have all the parts listed.
- When you are ready to start, make sure you have the right tools at hand (not supplied)
including a Phillips screwdriver, Stanley knife, wood saw, step ladder and drill with 2mm
bit.
- Ensure there is plenty of space and a clean dry area for assembly.
TIMBER
As with all natural materials, timber can be a ected during various weather conditions.
For the duration of heavy or extended periods of rain, swelling of the wood panels may
occur. Warping of the wood may also occur during excessive dry spells due to an interior
moisture loss. Unfortunately, these processes cannot be avoided but can be helped. It is
suggested that the outdoor building is sprayed with water during extended periods of
warm sunshine and sheltered as much as possible during rain or snow.
BUILDING A BASE
When thinking about where the building and base are going to be constructed:
Ensure that there will be access (60cm) to all sides for maintenance work and annual
treatment.
Ensure the base is level and is built on rm ground, to prevent distortion. Refer to
diagrams for the base dimensions. The base should be slightly smaller than the external
measurement of the building, i.e. The cladding should overlap the base, creating a run
o for water. It is also recommended that the oor be at least 25mm above the
surrounding ground level to avoid ooding.
TYPES OF BASE
- Concrete 75mm laid on top of 75mm hard-core.
- Slabs laid on 50mm of sharp sand.
Whilst all products manufactured are made to the highest standards of Safety and in
the case of childrens products independently tested to EN71 level, we cannot accept
responsibility for your safety whilst erecting or using this product.
Refer to the instructions pages for your speci c product code
Please retain product label and instructions for future reference
All buildings should be
erected by two adults
For ease of assembly, you
MUST pilot drill all screw
holes and ensure all screw
heads are countersunk.
2mm Drill bit
For ease of assembly use a
rubber mallet to t the log
boards. Do NOT use a heavy
hammer.
It is advisable to use a hand
saw when cutting roof and
oor boards.
For assistance please contact customer care on: 01636 821215
Mercia Garden Products Limited,
Sutton On Trent,
Newark,
Nottinghamshire,
NG23 6QN
www.merciagardenproducts.co.uk
Winter = High Moisture = Expansion
Summer = Low Moisture = Contraction
CAUTION
Every e ort has been made during the
manufacturing process to eliminate the
prospect of splinters on rough surfaces of the
timber. You are strongly advised to wear gloves
when working with or handling rough sawn
timber.
Ensure to measure and check before cutting
boards.
To ensure log boards are even, use a spirit
level to check each layer has been installed
correctly.
P 1

Advertisement

loading
Need help?

Need help?

Do you have a question about the 0628LOG136-V4 and is the answer not in the manual?

Questions and answers

Summary of Contents for Mercia Garden Products 0628LOG136-V4

  • Page 1 Winter = High Moisture = Expansion 0628LOG136-V4 Summer = Low Moisture = Contraction erected by two adults 0628LOG136-V4 28mm 4x4m corner cabin BEFORE YOU START PLEASE READ INSTRUCTIONS CAREFULLY For ease of assembly, you CAUTION MUST pilot drill all screw Every e ort has been made during the - Check the pack and make sure you have all the parts listed.
  • Page 2 0628LOG136-V4 Please retain product label and instructions for future reference Overall Dimensions: Width = 4482mm Depth = 3723mm Log Board - 28x120x2499mm QTY 7 Height = 2923mm LB28-AGL-2499 (1x45 deg cut right) Base Dimensions: Width = 3255mm Depth = 3899mm...
  • Page 3 Please retain product label and instructions for future reference Storm Brace - 27x44x2000mm QTY 8 Roof Truss - 40x70x2155mm QTY 1 F2744-2000mm AI-06LOGC4X4FRTR Closure Trim - 16x28x2400mm (approx length) QTY 14 S1628-2400 Roof Truss - 40x70x2155mm QTY 1 AI-06LOGC4X4FRTL Roof Truss - 40x70x1725mm QTY 1 Roof Block - 40x90x143mm QTY 1 AI-06LOGC4X4FRT F4090-143 (70mm shoulder 1x18 deg cut)
  • Page 4 Please retain product label and instructions for future reference Floor Board Pack Nail Bag AI-0628LOG127RB-V3FBP 70mm Bolt Set x16 40mm Screw x472 30mm Screw x84 120mm Screw x11 100mm Screw x 24 Felt Tacks x850 70mm Screw x88 MB16-3748mm QTY 20 MB16-P-3748 QTY 1 MB16-P-3644 QTY 1 MB16-P-3532QTY 1...
  • Page 5 Please retain product label and instructions for future reference IMPORTANT: Pre-drill before xing screws. Step 2 IMPORTANT: Pre-drill before xing screws. Step 1 Parts needed - No. 37 QTY 7 Parts needed - No. 36 QTY 1 No. 38 QTY 1 No.
  • Page 6 Please retain product label and instructions for future reference Step 3 IMPORTANT: Pre-drill before xing screws. IMPORTANT: Pre-drill before xing screws. Step 4 (See Pre-Assembly) Parts Needed - No. 3 QTY 1 Parts needed - No. 6 QTY 1 No. 13 QTY 1 No.
  • Page 7 Please retain product label and instructions for future reference Step 6 Step 8 Once you have laid 6 log boards (o Once you have laid the second level of boards onto the assembly of the starter) up the door section, slide the assembled door frame (No.
  • Page 8 Please retain product label and instructions for future reference Step 10 (See Pre-Assembly) Step 12 (See Pre-Assembly Parts needed - No. 7 QTY 1 Parts needed - No. 8 QTY 1 No.15 QTY 1 Make the assembly level by No. 17 QTY 1 adding another right hand No.
  • Page 9 Please retain product label and instructions for future reference IMPORTANT: Pre-drill before xing screws. IMPORTANT: Pre-drill before xing screws. Step 14 Step 15 Parts needed - No. 35 QTY 3 Parts needed - No. 32 QTY 1 No. 49 QTY 1 No.
  • Page 10 Please retain product label and instructions for future reference IMPORTANT: Pre-drill before xing screws. Step 17 IMPORTANT: Pre-drill before xing screws. Step 16 Parts needed - No. 30 QTY 3 Parts needed - No. 23 QTY 2 No. 24 QTY 1 No.
  • Page 11 Please retain product label and instructions for future reference IMPORTANT: Pre-drill before xing screws. Step 19 IMPORTANT: Pre-drill before xing screws. Step 20 Parts needed - No. 52 QTY 2 Parts needed - No. 52 QTY 6 No. 53 QTY 2 No.
  • Page 12 Please retain product label and instructions for future reference IMPORTANT: Pre-drill before xing screws. IMPORTANT: Pre-drill before xing screws. Step 21 Step 22 Parts needed - No. 52 QTY 6 Parts needed - No. 52 QTY 6 No. 53 QTY 6 No.
  • Page 13 Please retain product label and instructions for future reference IMPORTANT: Pre-drill before xing screws. Step 23 Step 24 IMPORTANT: Pre-drill before xing screws. Parts needed - No. 52 QTY 6 Parts needed - No. 52 QTY 8 No. 53 QTY 6 No.
  • Page 14 Please retain product label and instructions for future reference Step 25 IMPORTANT: Pre-drill before xing screws. Step 26 IMPORTANT: Pre-drill before xing screws. Parts needed - No. 52 QTY 4 Parts needed - No. 51 No. 53 QTY 4 No. 54 QTY 2 Place the oor boards (No.
  • Page 15 Please retain product label and instructions for future reference Step 27 Step 28 IMPORTANT: Pre-drill before xing screws. IMPORTANT: Pre-drill before xing screws. Parts needed - No. 48 QTY 7 Parts needed - No. 48 QTY 7 Roof Inside the building place the closure Once the oor has been laid arrange the trim (No.
  • Page 16 Please retain product label and instructions for future reference Step 29 IMPORTANT: Pre-drill before xing screws. IMPORTANT: Pre-drill before xing screws. Step 30 Parts needed - No. 50 Parts needed - No. 50 Following the individual triangle Sealing the felt with felt stamps, shape(s) of the roof measure and cut follow the measurements below.
  • Page 17 Please retain product label and instructions for future reference Step 31 Step 32 IMPORTANT: Pre-drill before xing screws. Parts needed - No. 45 QTY 2 Parts needed - No. 47 QTY 8 No. 46 QTY 3 Arrange the storm braces (No. 47) Attach the rst fascia (No’s.