Installation Instruction - Kemlan TEMPO 3 Installation & Operating Instructions Manual

Ver 2 freestanding

Advertisement

Pop rivet or
screw brackets to
the outside of the
outer casing
50
12mm
Air gap
Ceiling trim
DETAIL B
All 4.5" assembled flues must
have the crimps pointing
downwards
DETAIL C
All 7"-9" assembled flues must
have the crimps pointing upwards
DETAIL D
NOTE:- When Decromesh/Heatshield is fitted, it must
finish a minimum of 600mm below the ceiling or extend
NOTE:- When Decromesh/Heatshield is fitted, it must
through the ceiling drop box into the outer flue casing
finish a minimum of 600mm below the ceiling or extend
through the ceiling drop box into the outer flue casing
21/08/2020

INSTALLATION INSTRUCTION

TEMPO 3 VER 2 FREESTANDING
FLAT CEILING INSTALLATION
Short tube fits into flue
pipe. All flues should
be trimmed level
DETAIL A
Flash roof to outer casing
(supplied by installer)
50
150
Vented cap
crimped
plain
plain
crimped
9" Flue
7" Flue
4.5" Flue
B
C
Ver.7
A
Run a bead of silicone down
the vertical seam of the outer
casing to the flashing
Bracing supplied by installer
All casing flue pipes must
D
be connected with pop
rivets supplied by installer
Stainless steel flue pipe.
All flue pipes must be
connected with pop rivets
supplied by installer
Support outer flue with
Brackets supplied
Flue system to be installed
to suit AS/NZS 2918.2001
7" Decro
8