Kemlan XL MK111 Installation & Operating Instructions Manual

Xl freestanding mk. iii

Advertisement

Quick Links

KEMLAN XL FREESTANDING Mk. III
INSTALLATION & OPERATING INSTRUCTIONS
IMPORTANT:
INSTALLER PLEASE LEAVE THESE INSTRUCTIONS WITH THE UNIT ON COMPLETION.
1x900mm LENGTH HEATSHIELD OR DECROSHIELD MUST BE FITTED TO THE FLUE TO ACHIEVE
CLEARANCES TO HEAT SENSITIVE MATERIALS.
10 YEAR FIREBOX WARRANTY
The firebox is covered by a 10 year warranty.
Other parts are covered by a one year limited warranty.
Head Office – 13 French Avenue, Brendale, Queensland 4500
Telephone – PH: (07) 3490 5500
Facsimile – FAX: (07) 3490 5520
Website: -
www.kemlan.com.au
Business hours: - Monday to Thursday 7:30am-4:00pm. Friday 7:30am-2:00pm
Email: -
sales@kemlan.com.au

Advertisement

Table of Contents
loading

Summary of Contents for Kemlan XL MK111

  • Page 1 KEMLAN XL FREESTANDING Mk. III INSTALLATION & OPERATING INSTRUCTIONS IMPORTANT: INSTALLER PLEASE LEAVE THESE INSTRUCTIONS WITH THE UNIT ON COMPLETION. 1x900mm LENGTH HEATSHIELD OR DECROSHIELD MUST BE FITTED TO THE FLUE TO ACHIEVE CLEARANCES TO HEAT SENSITIVE MATERIALS. 10 YEAR FIREBOX WARRANTY The firebox is covered by a 10 year warranty.
  • Page 2: Overall Dimensions

    OVERALL DIMENSIONS OVERALL DIMENSIONS: A - 785mm w idth B - 838mm height C - 603mm depth D - 216mm depth (centre of flue to back)
  • Page 3: Technical Specifications

    TECHNICAL SPECIFICATIONS MINIMUM CLEARANCES FOR THE KEMLAN XL SOLID FUEL APPLIANCE INSTALLED WITH A DEFAULT FLUE KIT CORNER INSTALLATION STANDARD INSTALLATION D - 3200mm G - 1200mm A - 100mm E - 945mm H - 1060mm B - 550mm F - 620mm...
  • Page 4: Installation Instruction

    INSTALLATION INSTRUCTION TRIPLE FLUE KIT INSTALLATION TO COMPLY WITH AS/NZS 2918 Stainless steel Support outer flue w ith double cone bracket supplied. Run a cow l bead of silicon dow n seam of outer casing to ensure against leaks. 1000mm minimum distance above roof line or 600 minimum above ridge if penetration closer than 3 meters to ridge...
  • Page 5 INSTALLATION INSTRUCTION TRIPLE FLUE KIT INSTALLATION TO COMPLY WITH AS/NZS 2918 Stainless steel double cone cow l 10” Flue 8” Flue Support outer flue w ith 1000mm minimum distance bracket supplied. Run a above roof line or 600 minimum bead of silicon dow n seam above ridge if penetration of outer casing to ensure closer than 3 meters to ridge...
  • Page 6: Installation Instructions

    INSTALLATION INSTRUCTIONS MINIMUM HEIGHT OF FLUE SYSTEM EXIT INSTALLATION TO COMPLY WITH AS/NZS 2918 ANY NEARBY STRUCTURE 3000 3000 OR LESS MORE THAN 3000 600 MIN 3000 INCREASE AS NECESSARY UNTIL NOTHING WITHIN 3000 OF FLUE TOP 1000 MIN IF CLEAR WITHIN 3000 OF TOP OF FLUE 3000 OR LESS 3000...
  • Page 7 ABOUT CURING Your stove has been painted with the highest quality silicone stove paint and has special break-in procedures to cure it with heat and make it hard. VENTILATE WELL Ventilate the house during the first three times the stove is used. The paint on the stove will give off smoke heavy with carbon dioxide and has an odor.
  • Page 8 INSTRUCTIONS FOR OPERATING YOUR KEMLAN SLOW COMBUSTION WOOD BURNING HEATER Open the air inlet fully by sliding the air inlet control to high. Crumple at least three double pages of new spaper into loose balls and place them into the centre of the firebox.
  • Page 9: Operating Hints

    The same w ill apply w ith fuel w hich is not fully seasoned or is not dry enough. Kemlan have follow ed a policy since 1969 of c hecking on all complaints about poor performance of their heaters and apart from a few instances of incorrect installation (mostly insufficient flue length) all problems have been directly related to incorrect operation and/or poor fuel.
  • Page 11 4.9 Cost of inspection for damaged heater. CLAIMS – 5.1 (I) Kemlan will provide a full replacement of the heater in the first five years after installation. (ii) Replacement in the subsequent five years (i.e. sixth to tenth year after installation will be on the following basis.

Table of Contents