2. Connect the power cord to a 3-phase power outlet
400 V, 16 A fuse.
WARNING: Make sure that the power
outlet has RCD protection.
3. Pull the quick stop handle (B) until it is against the
handle. Keep the quick stop handle in this position
during operation.
4. Turn the speed switch to set the operation speed.
Position 1 gives 60 rpm and position 2 gives 120
rpm.
Note: If the speed switch is set to position 0, the
product stops. If the quick stop handle is engaged,
the product starts again if the speed switch is set to
position 1 or 2. To stop the product correctly, refer to
To stop the product on page 9 .
5. Push the start button (C) and hold the handle tightly.
C
a) If the phase sequence is incorrect, the direction
of rotation becomes incorrect. If the direction of
rotation in incorrect, the motor and gearbox
disengages. If this occurs, select the opposite
position 1 or 2 on the speed switch.
8
B
Working techniques
The floating operation removes dents on the concrete
surface. The concrete surface must be sufficiently hard
before the floating operation. The concrete surface is
sufficiently hard when a shoe gives only a small recess
on the concrete surface.
When the floating operation is completed, the concrete
surface is prepared for the troweling operation. The
troweling operation increases the density of the concrete
surface and makes it smooth and hard.
CAUTION: Look for loose stones on the
concrete surface during operation. Loose
stones can make marks that are not easy to
remove from the concrete surface.
To do the floating operation
1. Start the motor. Refer to
page 7 .
2. Turn the blade adjustment knob until there is tension
in the cable.
3. Move the product across the concrete surface.
4. Stop the product and remove it from the concrete
surface.
CAUTION: Do not let the product stay
stationary on the concrete surface. This
can cause marks and damages to the
concrete surface. When the product
stops, immediately lift the product from
the concrete surface.
To do the troweling operation
1. Start the motor. Refer to
page 7 .
2. Turn the blade adjustment knob until there is tension
in the cable.
3. Move the product across the concrete surface.
a) Turn the speed selection switch to position 1 or
2. Position 1 gives 60 rpm. Position 2 gives 120
rpm.
CAUTION: Adjust the speed for the
condition of the surface. Too high
speed can cause damage to the
surface.
b) Adjust the blade adjustment knob as necessary
during operation.
4. Stop the product and remove it from the concrete
surface.
5. Wait until the concrete is sufficiently set.
6. Do the procedure again and again until the concrete
surface has a satisfactory finish and is fully set.
To start the product on