TRIPOD
MOUNT
EVE
MOUNT
WALL
MOUNT
Secure the wire to the building using cable clips (do not use regular
staples). Form a drip loop where the wires enter the hole drilled
through the exterior wall. Caulk the hole when done.
2-CONDUCTOR
CABLE FROM
AC POWER
SUPPY
Mount the brass read-out directly over the cable feed-thru-hole
to avoid crimping the wire under the lip. We recommend mounting
the read-out on one of our pre-drilled and centered panels. Plug the
power supply into a 110 VAC power outlet.
info@Fluke-Direct.com
MAESTRO
INSTALLATION
CHIMNEY
MOUNT
8 FEET
VENT-PIPE
MOUNT
8
Feed the cables through the wall to where the read-out is going to
be located. Attach the wires to the rear of the read-out as shown.
The direction wires must follow in sequence for the direction sensor.
The polarity does not matter for the wind speed or power supply
connections. (Do NOT adjust the nuts that are already on the meter).
2-CONDUCTOR
CABLE FROM
WIND-SPEED
5
SENSOR
3 4
2
1
5-CONDUCTOR
CABLE FROM
WIND-DIRECTION
SENSOR
Fluke-Direct
(continued)
6
Follow the instructions supplied with the antenna
mount and secure the mast to the mount.
CABLE-HOLE
9
7
CABLE
CLIPS
CAULK
WIRE
DRIP
LOOP
CABLE-HOLE
CABLES
CABLES
WOOD
SCREW
PANEL
.com
1.888.610.7664
SCREW
SCREW
Need help?
Do you have a question about the Maestro and is the answer not in the manual?