4.3.2.3 Operation of measurements display
1. UPS measurements can be checked after UPS started by pressing select key
. The display sequence are as below figure-F (AC input voltage)figure-
G (AC input frequency)figure-H (UPS output voltage)figure-I (UPS output
frequency)figure-J (UPS loading percentage)figure-K (UPS output
current)figure-L (Battery voltage) figure-M (UPS inner temperature) and back
to figure-F.
F
G
H
I
23