Description Of Panel Board; Entry For Power Cables And External Leads; Standard Equipment - Riello RL 300/B MZ Installation, Use And Maintenance Instructions

Two-stage operation kerosene and gas oil burners
Table of Contents

Advertisement

4.8.1

Description of panel board

1
Relay outlet - voltage free contacts
2
Ignition transformer
3
Stop push-button
4
Dial for off - automatic - manual
st
nd
5
1
- 2
stage selector
6
Signal light for auxiliary voltage
7
Motor thermal cutout tripped warning light
8
Signal light for burner failure and lock-out reset button
9
Control box
10 Star-powered/delta-powered starter (only RL 400/B MZ)
11 Timer (only RL 400/B MZ)
12 Main supply terminal strip
13 Entry for power cables and external leads, see Fig. 6
14 Pump motor contactor and thermal cut-out
15 Air pressure switch
Two types of burner failure may occur:
Control box lock-out:
if the control box 9)(Fig. 5) pushbutton (red led) and the reset
button 8)(Fig. 5) light up, it indicates that the burner is in lock-out.
To reset, hold the pushbutton down for between 1 and 3 seconds.
Motors trip:
release by pressing the push button of the relevant thermal cutout
relay.
4.8.2

Entry for power cables and external leads

Key (Fig. 6)
1
Electrical supply
2
Fan motor
3
Triggering / Safety devices
4
Available
4.9

Standard equipment

1 - Thermal insulation screen
4 - Screws to secure the burner flange to the boiler: M 18 x 70
1 - Instruction booklet
1 - Spare parts list
Technical description of the burner
13
GB
1
2
15
14 10
11
D3318
13
4
4
S8283
In case of use with gas oil containing up to 10%
Bio blend, it will be essential to use flexible oil
lines suitable for bio fuel use.
Please contact Riello for further information.
WARNING
9
3 4 5
6
7
12
Fig. 5
3
3
3
4
1
2
4
4
4
4
4
Fig. 6
20035745
8

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rl 400/b mz

Table of Contents