Final Heater Assembly - Brant Radiant Heaters DET3-20-65 User Manual

Gas-fired infrared tube heater det3 series
Hide thumbs Also See for DET3-20-65:
Table of Contents

Advertisement

DET3
Series

Final Heater Assembly

Chart 3.6
Tube Installation Sequence, Baffle Location and
Secured Joints for Reflectors
20 Foot
30 Foot
40 Foot
50 Foot
60 Foot
Burner Control Box with
16" Burner Tube
Primary Combustion
Chamber Tube
Secondary Aluminized Steel
Combustion Chamber
(150-200 MBH models only)
Stainless steel clamp location on 150 - 200 MBH models (P/N: TP-220).
Aluminized steel secondary combustion chamber location on 150-200 MBH models.
Stainless steel clamp location on 150 - 200 MBH models (P/N: TP-220).
Aluminized steel secondary combustion chamber location on 150-200 MBH models.
Stainless steel clamp location on 150-200 MBH models (P/N: TP-220).
Aluminized steel secondary combustion chamber location on 150-200 MBH models.
Key
27
3.0
Installation
Final Heater Assembly
NOTE: When securing joints on reflectors
which are rotated on an angle from horizontal,
secure joint only on top side of reflector to allow
for sufficient heater expansion and contraction.
1 to 45° Mounting Angle
0° Mounting Angle
Hot-rolled Steel Radiant
Emitter Tube
Standard Tube Clamp
Stainless Steel Tube
Clamp (P/N: TP-220)
150-200 MBH models only - Located
between 1st and 2nd 10 ft. tube sections.
Baffle Location

Advertisement

Table of Contents
loading

Table of Contents