Left Side View; Back View - U-Line Closed Industrial Steel Shelving Instructions Manual

Table of Contents

Advertisement

Available languages

Available languages

Figure 1

LEFT SIDE VIEW

Post
Bolt
Side
Panels
1. To assemble left side, align holes of side panels and
posts and attach with nuts and bolts. (See Figure 1)
NOTE: Use 10 nuts and bolts per post.
Do not fully tighten nuts and bolts.
NOTE: Side panels overlap. Be sure to align
holes before attaching to posts.
NOTE: Side and back panels attach to
outside of unit.
2. Assemble right side. Repeat steps from above.
PAGE 2 OF 9
INSTRUCTIONS
Figure 2
Nut
Bolt
Back
Panels

BACK VIEW

Right Side Assembly
Post
3. Align holes of back panels with right and left side
assemblies, then attach with nuts and bolts.
(See Figure 2)
NOTE: Use 10 nuts and bolts per post.
Do not fully tighten nuts and bolts.
NOTE: Back panels overlap. Be sure to align
holes before attaching to posts.
Left Side Assembly
Nut
0321 IH-4351

Advertisement

Table of Contents
loading

Table of Contents