Operation - ROBLIN ALIZE Directions For Use And Instructions For Installation

Hide thumbs Also See for ALIZE:
Table of Contents

Advertisement

Available languages

Available languages

GB
Recycling
Fix the deflector with the support of the chimney (fig 2). The top of the tube with visible outlets will be
placed with the air reflector. A flexible tube with right diameter in connected with the outlet of the appli-
ance and the inlet of the air deflector
Fix woth the screws 4.2 x 9.5 the corner plates supplied with the hood inside the body.Set the active
charcoal filters in their housings with a strength of the strips A (figure 4)
8

OPERATION

Control Panel
The layout of the control panel is as follows:
Key I
:
Key II
:
Key III
:
Key
:
6
low speed
medium speed
high speed
ligthing

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the ALIZE and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Table of Contents