Quick Evaluation Before Installation - Cobra CPI 2550 Operating Instructions Manual

2500 watt power inverter
Table of Contents

Advertisement

Quick Evaluation
Introduction
Intro
Operation

Quick Evaluation Before Installation

This section provides you with basic information about
the inverter and how to check its performance before
installation.
Installation
Be sure to have on hand:
A 12 volt DC power source (such as a vehicle battery).
Secondary Icons
The power source must provide
Power Supply
between 11 and 15 volts DC and be
able to supply enough current to
run the test load. As a rough guide,
Notice
divide the wattage of the test load
by 10 to get the current (in amperes)
the power source must deliver.
A set of cables to connect the power source to the
inverter (not included).
The cables must be as short and thick as possible in
order to reduce the voltage drop between the power
source and the inverter when drawing current from
the power source.
If the cable suffers an excessive voltage drop, the inverter
may shut down when drawing higher currents because
the voltage at the inverter dropped below 10 volts.
#4 AWG stranded copper cable is recommended. It
should be no longer than four feet (one and one-half
meters).
The end of the cable that connects to the inverter must
have its insulation stripped off for about one-half inch
(one and one-half cm) back from the end, exposing the
bare copper.
The other end of the cable, which connects to the power
source, must be terminated with a lug or other connector
that provides a secure, low resistance connection.
For example, if the power source is a battery, the cable
must be terminated with a battery terminal that clamps
to the post on the battery.
English
4
Customer
Warranty
Assistance
Notes
Caution
Warning
Introduction
Intro
A test load that can be plugged into the AC receptacle on
Main Icons
the inverter for short term testing at a low power level.
The following cables are recommended for testing low
power level test loads only.
Test Load
Intro
Secondary Icons
To check your inverter's performance before installation:
Secondary Icons
On/Off Switch to Off
Main Icons
Connect Terminals
Intro
Connect Power Source
Secondary Icons
On/Off Switch to On
Connect Test Load
Quick Evaluation
Operation
Customer
Warranty
Assistance
Test Load
Minimum
Installation
Notes
Power
Cable Size
Operation
Customer
Warranty
Assistance
100W
# 16 AWG copper
250W
# 12 AWG copper
500W
# 8 AWG copper
Installation
Notes
Notice
Caution
Warning
1. Turn the inverter off (see page 14
for details). If the power source is
a DC power supply, switch it off
as well.
Notice
Caution
Warning
2. Connect cables to power input
terminals (see page 8 for details).
3. Connect cables to power source
(see page 8 for details).
Operation
Customer
Warranty
Assistance
4. Check to make sure all
connections are secure.
5. Turn the inverter on. If the
Installation
power source is a DC power
Notes
supply, switch it on first.
6. Plug in the test load.
The inverter should supply power
to the load. If the inverter is not
Notice
Caution
Warning
working properly, refer to the
troubleshooting guide on page 18
or power and protection indicators
section on page 16.
Nothing comes close to a Cobra
®
5

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents