Table Of Contents - ABB GE Power Break II GEH6271 Manual

Draw out 800–4000 ampere frames
Table of Contents

Advertisement

Power Break® II Devices
Draw-Out Device Installation

Table of Contents

Description............................................................................................................................................................................. 1
Features................................................................................................................................................................. ..................1
Installing the Device ............................................................................................................................................................. 3
Removing the Device ......................................................................................................................................................... ..5
Maintenance Procedures ....................................................................................................................................................6
Lubrication ............................................................................................................................................................................6
List of Figures
1. Rear view of the Power Break® II draw-out device.......................................................................................................... 1
2. Left side of device, showing padlock accessory and racking shaft lockout plate. .................................................... 1
operator cutoff switch. ...................................................................................................................................................... 2
4. Lifting Bar attached to a draw-out device for manual lifting. ..................................................................................... 3
5. Lifting Bar attached to a draw-out device for lifting with a hoist. .............................................................................. 3
6. Device installed on rails, ready to be pushed into the substructure........................................................................... 4
7. Wrench attached to the device racking shaft. ................................................................................................................ 4
8. Compartment position indicator on the front of the device. .......................................................................................4
9. Withdrawing the substructure rails.................................................................................................................................. 5
10. Rotating the device forward for inspection..................................................................................................................... 5
List of Tables
2. Catalog numbers of draw-out switches and corresponding substructures. ............................................................. 1
which substructures............................................................................................................................................................ 2
substructures....................................................................................................................................................................... 2

Advertisement

Table of Contents
loading

Table of Contents