Download Print this page

Greenhouse O Series Assembly Instructions Manual page 10

Advertisement

Front Gable
V201
A
2
V009
V203
V201
V203
B
p8
V916
11
B
p8
V916
Please note: 3 Bolts will need to be slid into each Part #V201 and #V202 for hanging basket bar or horizontal rail and
Side sill beam in advance, Finger tightens the nuts for later use.(Bolts and nuts in Package No.3 of Roof/Side wall)
V202
A
2
V009
V204
Square No.9
Use
the part #V226 to
connect
the
part
#V009 & #V203.
V226
V202
V204
10
B
p8
B
012
V916
Square No.8
After PC panels in position, then adjust the distance
same between PC panel and keyway edge.
8
V201
a9
V009
V009
V226
012
9
V009
Please Note: Don't let this bolt block polycarbonate panel to insert
into part #V201&V202 alu. frame channel. Insert PC panel first, then
slide this bolt in part #V201&V202 profile's trough.
p8
V916
10
Section View
a9
V009
V203
B
Square No. 10
Inserting PC panel
#B in profiles'
channel. With PVC
anti-dust strip #p8
on bottom.
Square No.11
Connect Part
#V916.
a9 is a
cropped
head
bolt

Advertisement

loading

This manual is also suitable for:

O907O910O912O914