Download Print this page
Ametek TELGUARD TG-PEM Quick Install Manual
Ametek TELGUARD TG-PEM Quick Install Manual

Ametek TELGUARD TG-PEM Quick Install Manual

Advertisement

Quick Links

TG-PEM Wiring Diagram
(zone connections not shown)
The connection from
Telguard Power on the
TG-PEM to the DC
connection on the TG-7
or TG-7FS should be the
ONLY power supply
connection. The AC
power and battery
connectors must NOT
be used. LED8 (AC
Power) should not be
lit.
Supervised zones utilize
2.2kΩ EOL resistors (not
provided).
STEP-BY-STEP:
1. Register the TG-7 or TG-7FS
Use the dealer portal at www.telguard.com.
2. Pre-configure the TG-PEM prior to installation
Use the Power Expansion Module tab for the device registered.
3. Mount the TG-7 or TG-7FS
Complete all steps of the physical installation as outlined in the
TG-7 series manual. Do not activate yet.
4. Mount the TG-PEM
Tip: To ease mounting of TG-PEM board, pre-thread the metal bracket
using the provided mounting screws (marked in red in diagram)
Remove top left mounting screw that holds the TG-7
series board (indicated by arrow).
Orient bracket as shown in diagram.
Quick Install Guide
Installing the TG-PEM inside the TG-7 or TG-7FS is simple, but watching our installation
video will get you going in no time and insure your installation is quick and easy.
Scan the QR code or visit
telguard.com/pem
including the full Installation Manual.
Alarm Panel
Burglary Systems: STC1 needs to
be connected to a 24-hour panel
input zone to indicate alarm
conditions from TG-PEM. STC2
could be used to indicate TG-7
trouble conditions.
for the installation video and other useful resources
TG-PEM
Panel Power (DC)
Fire Systems: STC1
needs to be connected
to a panel input zone
to indicate all trouble
Power from TG-PEM
conditions.
Insert bracket at an angle so that top mounting point
slides under board as depicted, and angled tab
threads through the enclosure bump out.
Replace screw to securely mount bracket and board.
Pre-thread using screws
LED1
LED2
LED3
LED4
LED5
LED6
LED7
LED8
TG-7FS
LTE
DC
STC2 STC1 TRIP
BATT
AC
Do Not Use these power
connectors when using TG-PEM.
LED1
LED2
LED3
LED4
LED5
LED6
LED7
LED8
TG-7FS
LTE
```
DC
STC2 STC1 TRIP
BATT
AC

Advertisement

loading

Summary of Contents for Ametek TELGUARD TG-PEM

  • Page 1 Quick Install Guide Installing the TG-PEM inside the TG-7 or TG-7FS is simple, but watching our installation video will get you going in no time and insure your installation is quick and easy. Scan the QR code or visit telguard.com/pem for the installation video and other useful resources including the full Installation Manual.
  • Page 2 Use the three provided mounting screws to secure the TG-PEM the ribbon cable should be oriented away from the board onto the bracket. antenna of the TG-7 or TG-7FS. 6. Power Up and Configure • Connect power and ground from the panel auxiliary output to the terminal labeled “PANEL POWER”...