4.2 Assembly SOP
Preparation before assemble
1. Clean the room for work
2. Identify the area for material
3. Prepare the implement, equipment, material as bellow:
1) Working table
2) Philips-head screwdriver
3) Glove
4) Cleaning cloth
ESD protection
Item
1
2
Picture
Operation
1. Assemble SPS BD to Main SHD
2. Insert two LVDS FFC cables to
I/F BD
3. Insert SPS BD wire to I/F BD and
assemble I/F BD to Main SHD
4. Lock 8 PCBA screws
1. Assemble Mylar to SPS BD
- 11 -
Tools
Notes
Philips-
head
screwdriver
(Torsion of
screw:
8.5±1.0kg)