ABB CGWB 13 Operator's Manual page 13

Heatable sample gas lines
Table of Contents

Advertisement

3
Splice the heating cable and strip the end insulation of one of the two
wires of the heating cable by 10 mm.
1
Heating cable with protective braiding
2
Resistance wire
3
Insulated copper conductor, strip 10 mm!
4
Insulated copper conductor
4
Insulate the cable ends with the enclosed shrink sleeve.
1
Heating cable with protective braiding
2
Shrink sleeve
5
Pass the end piece over the process line.
1
Sample gas line
2
End piece