Post-Installation Checkout - GOODRICH Stormscope Series II Installation Manual

Weather mapping sensor
Table of Contents

Advertisement

3.3 POST INSTALLATION CHECKOUT
This procedure will validate the installation and return to service of the WX-950.
1.
Rotate the OFF/BRT knob clockwise about 180 degrees. After approximately 15 seconds, the
initialization screen (see figure 3-2) will be displayed. During initialization, the system runs a series of
self-tests to ensure that all functions are operating properly. These tests are designed to check the
antenna, processor, and associated hardware.
2.
If no faults are detected, at completion of the self-test an " ALL TESTS PASSED" message will be
displayed (see figure 3-3). Proceed to step 4.
3-2
Rev. C
WX-950
Installation Manual
Figure 3-2. Self-Test in Progress
Figure 3-3. Self-Test Passed

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Stormscope Series II and is the answer not in the manual?

This manual is also suitable for:

Stormscope wx-950

Table of Contents