Step-By-Step Installation - Samsung RR39 Series User Manual

Hide thumbs Also See for RR39 Series:
Table of Contents

Advertisement

Installation

Step-by-step installation

STEP 1 Select a site
Site requirements:
• Solid, level surface without carpeting or flooring that may obstruct ventilation
• Away from direct sunlight
• Adequate room for opening and closing the door
• Away from a heat source
• Room for maintenance and servicing
• Temperature range: between 10 °C and 43 °C
Clearance
See the pictures and table below for space requirements for installation.
B
A
26
English
Untitled-1 26
Overall Height "C"
C
Depth "A"
Width "B"
1853
694
595
(unit : mm)
2021-06-16
12:21:18

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents