1. General Information
These instructions should be read carefully and retained for
further reference and maintenance.
Timeguard reserve the right to alter these instructions
Note:
at any time. Up to date instructions will always be available
for download at www.timeguard.com
2. Safety
• Before installation or maintenance, ensure the mains supply
to the luminaire is switched off and the circuit supply fuses
are removed or the circuit breaker turned off.
• It is recommended that a qualified electrician is consulted or
used for the installation of this luminaire and install in
1
accordance with the current IEE wiring and Building
Regulations.
• Check that the total load on the circuit including when this
luminaire is fitted does not exceed the rating of the circuit
cable, fuse or circuit breaker.
• To clean use a clean dry cloth only. Do not use liquid cleaners.
3. Technical Specifications
• Mains Suppply:
• Class Protection:
• IP Rating:
• Operating Temperature:
• PIR Switching Capacity:
220-240V AC 50Hz
Class I
IP44
0˚ to 40˚C
x2 35W Halogen or
x2 15W LED
Need help?
Do you have a question about the TIMEGUARD UDSS2PIR and is the answer not in the manual?