• Mark the position of the mouting holes on the wall using
the wall plate as a template.
• Drill the holes for the wall plugs ensuring not to infringe on
any gas/water pipes or electrical cables that may be hidden
below/behind the surface.
4
• Pass through the mains supply cable into the wall plate via
the grommet/cable grand ensuring there is a tight grip on
the cable to maintain the IP rating of the luminaire.
• Mount the wall plate to the wall, using the fittings provided.
• Connect the mains supply to the revelant terminals ensuring
the correct polarity is observed and that all bare conductors
are sleeved (see section 5. Connection Diagram).
Need help?
Do you have a question about the TIMEGUARD UDSS2PIR and is the answer not in the manual?