Installation And Setting; Step 5 : Operation - LG AC Ez Touch PACEZA000 Installation Manual

Table of Contents

Advertisement

INSTALLATION AND SETTING

8
INSTALLATION AND SETTING
In this chapter, it describes the installation and setting method to set AC Ez Touch.
To use AC Ez Touch, you need to establish the environment for the controller and the equipment
(Air-conditioner/Ventilation/Heating) to communicate with each other, and you need to register
the corresponding equipment through AC Ez Touch.
You need to install in the following order.
Step 1 : Installation environment check and setting up the equipment address
Before installing AC Ez Touch, check the network composition with the interfaced equipment,
and assign address that does not overlap on the connected equipment.
Step 2 : Product installation and RS485 communication connection
Install AC Ez Touch and connect RS-485 communication cable.
Step 3 : Connecting cables and power adapter
Connect network and other cables, and then connect the power adapter.
Step 4 : Air-conditioner/Ventilation equipment/Heating equipment registra-
tion and group set-up
Register the connected air-conditioner, ventilation and heating equipment, and set the group.

Step 5 : Operation

Check if basic control and the set up contents work normally.
• Installation work requires specialized technology. Therefore, the installation contents men-
tioned in this chapter must be carried out by a qualified installation technician.
• If you have questions or requests related to the installation, please contact the service
center or specialist installation company acknowledged by LG Electronics.

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ac ez touch caceza000

Table of Contents