Download Print this page

Yale 3000 Quick Start Manual page 6

Advertisement

3000 Parallel Arm Installation (Right Hand Shown) continued
7. Remove arm and attach as shown.
RH: Position flat at R
LH: Position flat at L
9. Connect arms, preload spring and
tighten set screw.
Rotating arm
preloads closer
spring power.
2nd
3rd
1-1/2
(38)
4th
By hand,
position arm
5th
elbow to be
1-1/2" from
door face.
��
Go to page 2 for closer adjustments and decorative cap or cover installation.
Yale Commercial is a business associated with ASSA ABLOY Access and Egress Hardware Group, Inc., an ASSA
ABLOY Group company. Copyright © 2019, ASSA ABLOY Access and Egress Hardware Group, Inc. All rights
reserved. Reproduction in whole or in part without the express written permission of ASSA ABLOY Access and
Egress Hardware Group, Inc. is prohibited.
An ASSA ABLOY Group brand
1st
2nd
1st
You've now installed the 3000 Hold Open Closer - Parallel Arm.
Yale Locks & Hardware
Product Support Tel 800.438.1951 • www.yalelocks.com
8. Open latch and sweep valves.
10. Set Hold Open.
2nd
LH: Counter
clockwise to
tighten.
3rd
Do not completely
open valves. Valves
will leak.
Arm under tension.
Keep fingers away
from moving parts.
Keep door open in position
until dial screw secures dial.
2nd
RH:
Clockwise
to tighten.
1st
1st
80-9303-3207-010 Rev 1 05/19
3rd

Advertisement

loading

This manual is also suitable for:

311132113511