Maintenance; Recommended Maintenance Schedule - Schwank MonsterFans Style Series Installation Manual

Table of Contents

Advertisement

Maintenance

Warning! Risk of shock!
Only qualified personnel to remove drive cover! There is no
adjustments or replacement parts for the use!
Terminals:
Power Terminal: 3A, 300V, 10-30 AWG Torque = 0.5-0.6 Nm [0.37-0.44 ft-lb]
I/O Terminal: 17.5A, 300V, 12-30 AWG Torque = 0.6-0.8 Nm [0.44-0.59 ft-lb]
Power Cord:
Minimum 16AWG 3 Conductors rated 300VAC, use Copper Conductors only. For permanent
connection only.
Warning! Risk of shock!
If unusual oscillating movement is observed, immediately
stop using the ceiling fan and contact the manufacturer,
its service agent or suitably qualified persons.

Recommended Maintenance Schedule

1. No maintenance shall be done on the fan, mount or guy wires while it is in operation or powered.
2. No maintenance shall be done on the fan controller while powered unless the task involves
reprogramming or troubleshooting the electrical system.
3. No maintenance shall be done within a 6m [20ft] horizontal radius of the fan and 1.2m [4ft] below
and none above the blade level while it is in operation.
4. While doing maintenance on the fan, mount, or guy wires, a safety barrier shall be erected at a
radius of 6m of the centre of the fan.
5. The fan controller shall be locked out while maintenance is ongoing on the fan, mount, or guy
wires.
6. All personnel working on the fan, mount, or guy wires, shall wear the appropriate personal safety
equipment as mandated by local, provincial, and national regulations.
7. A risk assessment shall be performed before any maintenance is done on the fan, mount, guy
wires and fan controller.
8. A tailboard meeting shall be performed before any work is done. A checklist shall be completed
and shall include any emergency contacts for the area.
20
schwankgroup.com/monsterfans
Maintenance
Maintenance Schedule
Initial Six Months
Check for hot spots
Re-tighten all loose electrical connections
Check all nuts/bolts/clamps [missing/loose/damaged]
Physical check of safety cable, re-tightening of clamps if required
Repeat Every Eighteen Months Thereafter
schwankgroup.com/monsterfans
21

Advertisement

Table of Contents
loading

Table of Contents