Bison HHBD01SK-01 Operating And Maintenance Manual page 9

Electric chain hoist 3 phase /230-460v 60hz
Hide thumbs Also See for HHBD01SK-01:
Table of Contents

Advertisement

Hoists with Motorized Trolley
Installing an electric chain hoist to the motorized trolley and fitting the trolley to a beam:
1.
Insert the suspension shaft into the side plate G and lock it with the suspension shaft bolt, slotted nut
and split pin. Ensure the branches of the split pin are fully bent.
2.
Place the wheels of side plate G on the left flange of the beam, ensuring the side guide rollers are
contacting the flange.
3.
Refer to the tables on pages 11 and 12. Adjust the spacers accordingly ensuring Suspender T of the
hoist is directly in line with the center of the beam.
4.
Slide the hoist [suspension T] onto the suspension shaft.
5.
Add the required amount of spacers onto the suspension shaft until the side guide rollers contact the
flange of the beam.
6.
Place all excess spacers onto the shaft on the outer side of Side Plate S.
7.
Lock the suspension shaft with the suspension shaft bolt, slotted nut and split pin. Ensure the
branches of the split pin are fully bent.
8.
Connect the hoist to the trolley by inserting the trolley plugs into the hoist sockets. Make sure the
power supply, upper cord from the trolley [Plug 4P] (see diagram on page 10) is connect to the lower
socket of the hoist and the lower push button cord [Plug 5P] is connected to the upper socket of the
hoist.
9.
Connect the pendant cord [Plug 8P] to the socket [Socket 8P] on the trolley switch box.
10. Attach the cord strain relief cable to the cord support on the trolley.
11. Once all plugs are correctly connected, screw the plugs in to secure them.
9

Hide quick links:

Advertisement

Table of Contents
loading

Related Products for Bison HHBD01SK-01

This manual is also suitable for:

Hhbd02sk-01Hhbd03sk-01Hhbd05sk-02

Table of Contents