Assembly Instructions
Step 9 - Install Cross Supports (H)
Assemble the six Cross Supports (H) by placing the rivets located on both ends of the cross support into the
triangular holes located on the top ledge of the both beam assemblies.
Step 10 - Install Wire Decking (I & J)
Place the End Wire Decks (I) on the ends of the beams with the notched corners facing the end corners of the posts.
Next place the two Center Wire Decks (J) between the previously installed end wire decks.
I
I
Step 11 - Final Inspection
Check each beam and post connection to be sure that
the beams are properly seated and brackets are firmly
connected to the overhead joists. Make sure all bolts
and nuts are properly tightened. It is recommended to
periodically repeat this inspection process to ensure
safety. Retain this manual for future use.
H
I
Note: Be sure the
notched ends on the
End Wire Deck (I) are
installed facing the posts.
H
8
✓
J
J
✓