Clean Air AtmosAir FC-400 Series Installation, Operation And Maintenance Manual

Clean Air AtmosAir FC-400 Series Installation, Operation And Maintenance Manual

Advertisement

Quick Links

Installation, Operation
and Maintenance Guide
FC-400 Series
OUR MISSION
To improve health and wellness by actively restoring indoor air
to its pure, natural state where no pollution or contaminants
exist, while reducing energy use and emissions in the process.
IMPORTANT
Save this Document
for Future Reference &
Warranty Information
AtmosAir.com
CAG-06-21-003

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the AtmosAir FC-400 Series and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Clean Air AtmosAir FC-400 Series

  • Page 1 Installation, Operation and Maintenance Guide FC-400 Series OUR MISSION IMPORTANT To improve health and wellness by actively restoring indoor air Save this Document to its pure, natural state where no pollution or contaminants for Future Reference & AtmosAir.com exist, while reducing energy use and emissions in the process. Warranty Information CAG-06-21-003...
  • Page 2 Installation, Operation & Maintenance Guide FC-400 Series !IMPORTANT! READ THIS BEFORE STARTING INSTALLATION. DO NOT THROW AWAY THIS GUIDE. For safe installation you MUST: ■ Always disconnect power to the unit before handling any of the components. ■ DO NOT connect to the power before the installation is complete and personnel are aware of the imminent operation.
  • Page 3: Table Of Contents

    Installation, Operation & Maintenance Guide FC-400 Series Table of Contents 01 PRODUCT OVERVIEW FC-400 Diagram 02 INSTALLATION Mechanical Installation Electrical Installation 03 FIELD WIRING DIAGRAMS Diagram 1 Diagram 2 Diagram 3 Diagram 4 Diagram 5 04 OPERATION 05 MAINTENANCE RECOMMENDATIONS 06 TROUBLESHOOTING 07 EXPLANATION OF TECHNOLOGY 08 PRODUCT WARRANTY...
  • Page 4: Product Overview

    The number and size of the ionization units used is dependent upon the airflow, size of the space, and severity of the pollution and odors. The AtmosAir FC-400 series equipment is designed for minimal maintenance.
  • Page 5: Installation

    02 INSTALLATION AtmosAir FC-400 series equipment are mounted using the baseplate mounting flange. The units operate best when located after all filters, coils, and fans. Various mounting arrangements are possible; however, the available options may be limited due to size and configuration restrictions.
  • Page 6: Electrical Installation

    Installation, Operation & Maintenance Guide FC-400 Series Electrical Installation ■ AtmosAir FC-400 series systems require an average of 4.5 watts per unit. ■ Follow proper electrical procedures, guidelines, and codes for providing power supplies to the systems. Including requirements for conduit, sufficient ampacity, phase balancing, etc. Electrical installation should be performed by a qualified electrician.
  • Page 7: Field Wiring Diagrams

    Installation, Operation & Maintenance Guide FC-400 Series 03 FIELD WIRING DIAGRAMS AIRFLOW SAMPLING TUBE JUNCTION BOX INSERT 6" INTO AHU OR DUCT AFTER 120 VAC FAN, AIRFLOW INTO TUBE END. SILICONE IN PLACE 1/4" POLYETHYLENE TUBING LID IS REMOVABLE ATMOSAIR FC-400 LEAVE OPEN TO OR FC-400FM AMBIENT AIR...
  • Page 8: Diagram

    Installation, Operation & Maintenance Guide FC-400 Series 03 FIELD WIRING DIAGRAMS CONTINUED 240 VAC 50/60HZ AIRFLOW SAMPLING TUBE 'EURO' PLUG INSERT 6" INTO AHU OR DUCT AFTER WITH 13 AMP FAN, AIRFLOW INTO TUBE END. INTEGRAL FUSE SILICONE IN PLACE 1/4"...
  • Page 9 Installation, Operation & Maintenance Guide FC-400 Series 03 FIELD WIRING DIAGRAMS CONTINUED ATMOSAIR FC-400 OR FC-400FM 4"-6" 21 GAUGE MOUNT INTO 2.5" HOLE IN DUCT 12VDC (POLARIZED) 24VAC RED + (NO POLARITY) RED + BLACK - WHITE WHITE BLACK - UNLESS OTHERWISE SPECIFIED: ATMOSAIR SOLUTIONS NAME...
  • Page 10 Installation, Operation & Maintenance Guide FC-400 Series 03 FIELD WIRING DIAGRAMS CONTINUED ATMOSAIR FC-400 FM 2.5" POSSIBLE POSSIBLE POSSIBLE GREEN SHRINK TUBES 120VAC TO 240VAC 120/240 VAC AUTO SWITCHING JCT. BOX TRANSFORMER 12VDC 5' CABLE FEMALE SPADE TERMINALS FIELD WIRING UNLESS OTHERWISE SPECIFIED: ATMOSAIR SOLUTIONS NAME...
  • Page 11 Installation, Operation & Maintenance Guide FC-400 Series 03 FIELD WIRING DIAGRAMS CONTINUED POSSIBLE POSSIBLE SUPPLY 120/240VAC UNIVERSAL SS304 SOURCE GREEN SHRINK MOUNTING BRACKET PROVIDED TUBES STANDARD FEMALE SPADE TERMINALS CAN BE BENT PER APPLICATION 12VDC DETAIL B 120VAC TO 240VAC AUTO SWITCHING POSSIBLE TO INSTALL TRANSFORMER...
  • Page 12: Operation

    Installation, Operation & Maintenance Guide FC-400 Series 04 OPERATION Recommended Maintenance Procedures: Once the system is properly installed and all personnel are ■ Visually check the performance of the system by clear of the high voltage tubes, the system can be turned on: checking the blue light on the unit.
  • Page 13: Troubleshooting

    Installation, Operation & Maintenance Guide FC-400 Series 06 TROUBLESHOOTING In the event that the system is not functioning, follow these The next step is to determine the cause of the failure, or steps IN ORDER: blown fuse. Typically, failures are caused by arcing between the inner and outer electrodes, or between one electrode 1.
  • Page 14: Explanation Of Technology

    Installation, Operation & Maintenance Guide FC-400 Series 07 EXPLANATION OF TECHNOLOGY AtmosAir Solutions’ ™ mission is to bring and restore every indoor environment the same clean and pure quality air that is typically found at higher mountain elevations. AtmosAir’s unique and proven air purification process significantly reduces mold, controls the spread of bacteria and airborne viruses, and reduces airborne particles that evade normal filtration solutions.
  • Page 15: Product Warranty

    (27) months from the date of Clean Air Group’s delivery of the product, whichever occurs first, Clean Air Group shall repair or replace the product without charge to the Customer. Proof of malfunction and return of the non- working product must be presented by the Customer if submitting a warranty claim.

Table of Contents