Install The Insulation - Xylem Bell & Gossett CRS Instruction Manual

Coalescing-style air and sediment separator
Table of Contents

Advertisement

WARNING: RUPTURE OR EXPLOSION HAZARD
Like most pressurized tanks, this tank can over time corrode, weaken, and burst or explode.
Failure to follow this instruction may result in serious personal injury or death and property
damage.
WARNING: Chlorine & aggressive water hazard
The water quality can significantly influence the life of your product. You should test for
corrosive elements, acidity, total solids, and other relevant contaminants, including chlorine
and treat your water appropriately to insure satisfactory performance and prevent premature
failure. Failure to follow this instruction may result in serious personal injury or death and
property damage.
Before filling and starting the operation of a HVAC system, a properly applied and sized
pressure relief valve must be installed and in good operating order.
During filling and start-up after servicing, the system pressure should be closely monitored to
ensure the pressure does not exceed the pressure relief valve rating.
For more information, see pressure relief valve manufacturer instructions.

4.5 Install the insulation

1. To maximize energy savings, attach insulation to the Series CRS after the system has
been balanced. Use tape or other acceptable means to secure the insulation to the
separator.
2. Provisions must be made to permit removal of the coalescing media and optional
magnetic separator assembly and access to the skim valve port.
CRS Instruction Manual
– The insulation must not cover the following components:
– Air vent
– Blow down
– Skim valve port
– If applicable, magnetic separator
– The insulation must be installed after the system has been balanced.