4.2 Prerequisites

• The CRS separator must be installed before the pump inlet to increase the pump
performance and seal life.
• The CRS separator must not be installed on a dead pipe or in an overhead joist space.

4.3 Install the CRS

1. Before installation, check that the CRS is not damaged.
If the CRS is damaged, replace the CRS.
1. B&G Series CRS
2. From boiler, chiller, or converter
3. B&G model 98 high capacity air vent (Optional)
4. To system
5. B&G triple duty valve
6. B&G system pump
7. B&G suction diffuser
8. Drain
9. B&G pressurized expansion tank
10. Pressure gauge
11. B&G #7 or #87 air vent
12. Blowdown
2. Install the CRS vertically in the following positions:
There must be sufficient space for inspection, maintenance, and service.

4.4 Pipe hanging installation

CAUTION: Lifting lugs
Use unit lifting lugs only to lift unit as shipped from factory. Unit must be empty and
disconnected from pipe, and other restraints. Use proper rigging procedures. Failure to
follow these instructions could result in injury or property damage.
The wet filled weight of the Series CRS separators can exceed the strength of the supports
used.
Make sure that provisions are made to properly support the wet filled separator.
Welding to the pressure vessel boundary will void the ASME stamp.
NOTICE:
Never use the separator itself as a form of piping support. Please support separator and
piping according to the local building code. Failure to follow these instructions may result in
property damage.
A manual blowdown valve can be added to the blowdown connection at the bottom of the
separator. The function of the blowdown valve is to facilitate the purging of sediment from
the vessel.
8
– Air vent port at the top
– Blow drain port at the bottom