HITROL HLT-1110 Series Instruction Manual

HITROL HLT-1110 Series Instruction Manual

Tank level gauge

Advertisement

Quick Links

HLT-1110 Series
HITROL CO., LTD.
HEAD OFFICE.FACTORY.R&D INSTITUDE
HITROL CO., LTD. 141, Palhakgol-gil, Jori-eup
Paju-si, Gyeonggi-do, Korea
TEL. : (+82)-31-950-9700
FAX. : (+82)-31-943-5600
www.hitrol.com
INSTRUCTION MANUAL
TANK LEVEL GAUGE
HLT-1110 Series
Doc. no. : HLT1110_IM_Eng_Rev. 3
Issue date : 2021. 02
HITROL CO., LTD.
1

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the HLT-1110 Series and is the answer not in the manual?

Questions and answers

Summary of Contents for HITROL HLT-1110 Series

  • Page 1 HLT-1110 Series HITROL CO., LTD. HEAD OFFICE.FACTORY.R&D INSTITUDE HITROL CO., LTD. 141, Palhakgol-gil, Jori-eup Paju-si, Gyeonggi-do, Korea TEL. : (+82)-31-950-9700 FAX. : (+82)-31-943-5600 www.hitrol.com INSTRUCTION MANUAL TANK LEVEL GAUGE HLT-1110 Series Doc. no. : HLT1110_IM_Eng_Rev. 3 Issue date : 2021. 02...
  • Page 2: Table Of Contents

    Characteristics ............3 Specification ............4 Product Configuration and Technical Data ....4 HLT-1110 Series for Cone Roof Tank ......4 HLT-1110 Series for Underground Tank ....5 HLT-1110 Series for floating Tank ....... 6 HLT-1110 Series for with U-Seal Pot ......7 HLT-1110 Series for with Guide Pipe ......
  • Page 3: Overview

    HLT-1110 Series The HLT-1110 Series level gauge is an instrument used to measure the level of fluid stored in the tank Overview using a spring as the float moves. It can be used in a variety of industries such as crude oil, oil refining, petrochemicals, food industries, power plants, and water treatment.
  • Page 4: Specification

    Up to ±0.05% of F.S Combination Transmitter HAT Series Screw Type: PT 1-1/2”(F) Socket (Std.) Process Conn. Size Flange Type: 1-1/2”(40A) Flange (Std.) ■ HLT-1110 Series for Cone Roof Tank Product Configuration [User Scope] and Technical Sheave Elbow Nozzle socket Data PT 1-1/2”...
  • Page 5: Hlt-1110 Series For Underground Tank

    HLT-1110 Series ■ HLT-1110 Series for Underground Tank Gauge support [User Scope] Stanchion Pipe Gauge head [User Scope] Nozzle socket [User Scope] PT 1-1/2” (40A) Pipe PT 1-1/2” (40A) Top anchor [User Scope] Nozzle socket PT 1” (25A) Measuring tape...
  • Page 6: Hlt-1110 Series For Floating Tank

    HLT-1110 Series ■ HLT-1110 Series for floating Tank Measuring wire Measuring tape 90° Elbow Measuring tape [User Scope] Pipe PT 1-1/2” (40A) Pipe support Measuring wire Floating tank Gauge head Float Gauge support HITROL CO., LTD.
  • Page 7: Hlt-1110 Series For With U-Seal Pot

    HLT-1110 Series ■ HLT-1110 Series for with U-Seal Pot Sheave elbow U-Seal pot [User Scope] Nozzle socket PT 1-1/2” (40A) [User Scope] Pipe Top anchor PT 1-1/2” (40A) [User Scope] Nozzle socket PT 1” (25A) Pipe support Measuring tape Gauge head...
  • Page 8: Hlt-1110 Series For With Guide Pipe

    HLT-1110 Series ■ HLT-1110 Series for with Guide Pipe Sheave elbow [User Scope] Nozzle socket PT 1-1/2” (40A) [User Scope] [User Scope] Pipe Flange (150A) PT 1-1/2” (40A) [User Scope] Guide pipe (150A) Pipe support Measuring tape Gauge head Gauge support Float HITROL CO., LTD.
  • Page 9 HLT-1110 Series ■ Part Name and Dimensions The dimensions on the following pages are indicated in [mm] [Gauge head] HITROL CO., LTD.
  • Page 10 HLT-1110 Series [Part] Sheave elbow (AL) Sheave elbow (SUS) Top anchor Pipe support U-bolt Gauge support HITROL CO., LTD.
  • Page 11 HLT-1110 Series Bottom anchor Float U-seal pot (CS+AL) U-seal pot (SUS) HITROL CO., LTD.
  • Page 12: Installation

    HLT-1110 Series Installation 1. Conditions for Installation and Adjustment 1) Make sure that the pipes and bottom anchor are ready. 2) It doesn’t matter if you install the pipes and Sheave elbow first. 3) The inside of the tank should be empty and there should be no interference in instrument installation.
  • Page 13 HLT-1110 Series 2.2 Measuring Tape Installation 2.2.1 Installation Sequence of Measuring Tape (Head Part) 1) Insert the measuring tape into the sheave elbow. ① Uncover both Elbow-A and Elbow-B. [Refer to Figure.2] ▶ At this point, elbows and pipes should be installed first.
  • Page 14 HLT-1110 Series 2) Install the measuring tape to the gauge head. ① Open the back cover of the head. ② Pull the measuring tape out of the upper elbow through the hole in the connection section above the gauge head downwards.
  • Page 15 HLT-1110 Series 2.2.2 Installation Sequence of Measuring Tape (Float Part) 1) Fold the end of the measuring tape on side Elbow-A in order ① to ⑥ and connect it to the float. [Refer to Figure.6] ① Fold the end of the measuring tape about 60~70mm.
  • Page 16 HLT-1110 Series 2.3 Spring Installation 1) Secure the measuring tape to the tape drum using a tape locking screw, then turn the tape drum counter- clockwise to wind the measuring tape so that the float is placed on the top of the tank. [Refer to Figure.7] 2) Bolt the spring on the spring loaded drum①...
  • Page 17: Installation Summary

    HLT-1110 Series 2.4 Gauge Adjustment and Completion 1) Adjust the gauge to the current level of tank. 2) After adjusting the float position and gauge, make sure that the measuring tape is not dislodged from the roller of the sheave elbow.
  • Page 18 HLT-1110 Series ■ Float - Make sure that float holder which is connected with the measuring tape is facing upward, when installing the float. - The position of the float should be located away from the inlet of the fluid entering the tank to prevent the float from being affected by the fluid flow or swirling.
  • Page 19: Gauge Operation

    HLT-1110 Series ■ Gauge Support - Install the gauge support on the outside wall of the tank. - When securing the gauge head to the gauge support, it should be installed in the center of the mounting of the gauge support as it is bolted. [Refer to Figure.13] [Figure.
  • Page 20: Maintenance

    A/S can be requested through our website or below head office. Head office · Factory · Laboratory Contact Number ■ ADDRESS: HITROL CO., LTD 141(98), Palhakgol-gil-road, Jori-eup, Paju-si, Gyeonggi-do, Korea TEL: (+82)-31-950-9700 (Head Office and A/S) FAX: (+82)-31-943-5600 (Head Office and A/S) F A X : 031-943-5600 (본사...