Power Towers Pecolift Operating And Maintenance Manual

Power Towers Pecolift Operating And Maintenance Manual

Hide thumbs Also See for Pecolift:

Advertisement

by
Operating and
Maintenance Manual

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Pecolift and is the answer not in the manual?

Questions and answers

Summary of Contents for Power Towers Pecolift

  • Page 1 Operating and Maintenance Manual...
  • Page 2: Table Of Contents

    Maintenance procedures 9-10 The Pecolift is suitable for any application provided it is used within its specified operating parameters. If used for applications such as Storage sand blasting, welding, paint spraying or with any other hazardous...
  • Page 3: Operating Specifications

    OPERATING SPECIFICATIONS OPERATING SPECIFICATIONS Working Dimensions Maximum working height: 3.50 m Maximum platform height: 1.50 m Platform dimensions: 720 mm (L) x 600 mm (W) Working footprint: 985 mm x 700 mm Safe working load: 150 kg (1 person + tools) Maximum manual force: 200 N Maximum gradient for operation:...
  • Page 4: Do's And Don'ts

    4. Never use in the vicinity of live conductors. of the machine. 5. Never try to move the Pecolift on its wheels when elevated. 4. Use the Pecolift internally only. 6. Never extend the height of the platform by using boxes, 5.
  • Page 5: Primary Components

    PRIMARY COMPONENTS PRIMARY COMPONENT LOCATIONS Tool Tray Flywheel Handle Flywheel Gates Platform Tray Emergency Spirit Lowering Tool Level Auto-Lok Swivel Braked Wheel Castor Rubber Foot (Pad)
  • Page 6: Operating Procedures (Incl. Emergency Operation)

    It is essential to be familiar with the correct operating procedures. The operator must have adequate training for this type of platform. The Pecolift can be fitted with a safety harness point. If the operator chooses to wear a safety harness, an approved ‘fall restraint’ type harness should be worn with a very short lanyard.
  • Page 7 OPERATING PROCEDURES PRE-OPERATION CHECKS 1. Visually inspect the Pecolift for any signs of damage to handrails, platform tray, chassis and mast lifting structure including mast fixing bolts. 2. Check castor and wheels rotate freely and are undamaged. 3. Check castor...
  • Page 8 OPERATING PROCEDURES EMERGENCY LOWERING OPERATION Never attempt to recover the machine/operator if there is any possibility the machine is contacting any live wiring/cabling and is therefore potentially ‘live’ . To lower the platform in the event of the operator being incapacitated (unable to operate the flywheel handle in the basket): 1.
  • Page 9: Maintenance Procedures

    MAINTENANCE PROCEDURES Please note that whilst the Pecolift is extremely simple to 2. Check that the guard rails are not damaged and all fixings are maintain, all work must be carried out by a competent person. secure. 3. Check gates, gate hinges, hinge springs and fixings are secure and NOTE: PUWER (The Provision and Use of Workplace Equipment gates close freely.
  • Page 10 MAINTENANCE PROCEDURES Six Monthly Checks - LOLER movement with 125% SWL due to the necessity to achieve a safe 1. Remove handle cover using suitable security screw tool method of conducting the test. and inspect and lubricate gearwheels. Use Omega 73 no. 2 harsh environment grease or equivalent.
  • Page 11: Storage

    STORAGE OF Pecolift STORAGE If the machine is due to be stored for periods in excess of one month, the following precautions should be taken: ensure the machine is fully lowered and ideally place a cover over the machine. Upon removal from storage and prior to returning to use, ensure machine pre-operation checks are carried out thoroughly, check LOLER certificate is current.
  • Page 12: Key Spare Parts

    KEY SPARE PARTS Part No. Wheel/Brake Sprocket PEL-M-400 Swivel Castor PEL-M-401 Spirit Level PT-M-106 Peco-lift gates (pair) PEL-M-402 Corner Foot (Pad) PEL-M-403 Mudguard PEL-M-404 Tool Box PEL-M-405 Peco-lift Decal Set 1 PEL-M-600 Peco-lift Decal Set 2 PEL-M-601 Peco-lift Decal Set 3 PEL-M-602 Chassis Cover PEL-M-406...
  • Page 13: Warranty Terms

    Pecolift for any purpose. Defects arising from neglect, misuse or unauthorised modifications.
  • Page 14 TEST RESULTS & NOTES Description Work Carried out Date ALTERATIONS & REPAIRS Description Work Carried out Date...
  • Page 15 PECO-OP | UK | 01.13 www.powertowers.com 100% British designed and manufactured.

Table of Contents