Toshiba RBC-TWP101E Installation Manual page 17

Air conditioner (split type)
Table of Contents

Advertisement

Available languages

Available languages

Branch Kit 1:2
 Address setup
For address setup procedure, refer to the indoor unit installation manual.
NOTE
When using the equipment at the first time, it will take a lot of time that the remote controller
accepts an operation after power was on. However, it is not a trouble.
Automatic address
While automatic addressing, the operation can not be performed on the remote controller.
For automatic addressing, Max. 10 minutes (generally, approx. 5 minutes) are required.
When power will be turned on after finish of automatic addressing;
It will require Max. 10 minutes (generally, approx. 3 minutes) that outdoor unit starts
operation after power was on.
16
EN
EN

Advertisement

Table of Contents
loading

Table of Contents