Basic Tools for Installation and Maintenance

Tool
1/4" to 1/2" Allen head socket driver
Torque wrench
Torque screwdriver
Wire cutters/wire crimpers
Voltmeter
Controller default password 00001
Table 12 Required tools for common installation and maintenace tasks

Equipment Inspection and Storage

Warning
When performing a hi-pot or dielectric test on
the power section of the ATS panel, DISCON-
NECT the complete electronics, controller,
and mechanism section of the ATS from the
power section to avoid potential damage to
the electronics.
Once you have received the transfer
switch, inspect it for any damage. This in-
cludes damage to the enclosure, power
panel, control panel and wiring harness. If
any damage is found or suspected, file a
claim as soon as possible with the carrier
and notify the nearest ABB Zenith
representative.
Task
Power cable connection
Torqueing of the lugs and other hardware as required.
Range of device to be 50 - 500 in-lbs (5-57 N-m)
Torqueing of control wire terminations, auxiliary contact
input terminals. 5 - 25 in-lbs (0.5 - 2.8 N-m)
Auxiliary contacts wire installation, Options installation
Trouble shooting tool for measuring incoming voltage,
frequency, continuity and control signal transmission.
Changing parameters within the controller
Before installation, if it is necessary, store
the transfer switch in a clean dry place,
protected from dirt and water. Provide
ample air circulation and heat, if neces-
sary, to prevent condensation.
See table 10 for recommended storage
and ambient operating temperatures.