15. MAINTENANCE SCHEDULE (recommendations)
Interval
Maintenance work
Check all connections for leaks
Check that the safety valve on the cold water supply is
functioning correctly.
Check that all components are intact and functioning as
intended
Clean all dirt filters/strainers in the substation
Check that any electrical cables are in serviceable condition
and that it is possible to disconnect the electrical power sup-
At least once a year
ply to the substation
Check the pipes and exchanger for signs of corrosion
Check that the insulation cover is intact
Check that the temperature regulators are set in accordance
with the instructions in this manual
Check the functions of all shut-off valves
*)Enduser/caretaker.
Note! After maintenance work has been carried out all gaskets HAVE to be replaced.
22 | © Danfoss | Produced by Danfoss Redan A/S | 2021.02
Akva Lux II VXe
Comments
If you identify a leak, replace the gaskets and retighten the pipe connec-
tions
Check the functionality by turning the lever on the safety valves
In the event of irregularities, lack of functionality or visible faults and
defects in a component, replace the component in questionn
Replace any filters that are not intact
Visual check. Check whether it is possible to disconnect the current to the
substation.
Visual check
Make sure that the insulation cover encloses the substation tightly
Follow the instructions in the present manual
Check that the ball valves open and close as they should
xxxxxxx

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Akva Lux II VXe and is the answer not in the manual?

Table of Contents