Download Print this page

FAS International 480 ELE Manual page 43

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 27
18
N.B. Periodically carry out the following control:
a) Mount the first cone (starting cone).
b) Lift it upwards with the crank-lever until stroke end .
c) Check that the distance between the first cone in zone B and the upper flange is mm 1207; the
height can be adjusted by screw A (see fig. 15).
fig. O
9.5 -PROCEDURE FOR REPLACING THE DRUMS
To replace the drums reverse the procedure for removing them. Take care that the plug of
each of them is aligned with the slot of the cone below so that evrery drums hooks in. Once all the
drums have been replaced, turn the crank-lever clockwise to lift the column.
When the crank-lever blocks, all drums are at their place. Check the alignement of the pistons of
the solenoids with the edge of the drums. The piston must be at the middle of the edge. Replace
the steel grates, release the pistons and close the machine.
FAS INTERNATIONAL srl

Hide quick links:

Advertisement

loading

Related Products for FAS International 480 ELE