Vent Terminal Installation - UTC SCS-5-08-3 Installation Instructions And Homeowner's Manual

Oil sealed combustion system
Table of Contents

Advertisement

Available languages

Available languages

7. 48 inches Long of extruded grey gasket 1/8'' X
1/2'';
o
8. A 90
galvanized increaser 3 inches / 4 inches
elbow for the burner combustion air intake junction
with 4 inches aluminum pipe;
9. 4 inches diameter collar for aluminum combustion
o
air pipe and 90
elbow joint;
10. Half moon cover;
11. Half moon plate to fix the vent pipe on the vent
terminal assembly;
12. Plate "L";
13. 1 inches thick neoprene outside gasket;
14. One tube or high temperature sealant;
2.4)

VENT TERMINAL INSTALLATION

CAUTION
Do not forget to remove the 4 inches diameter pipe
from the 5 inches diameter pipe. The appliance can
not operate with both pipes inside each other. This
configuration is used for shipping purposes only.
2.4.1) Preparation and requirements
The vent terminal can be installed to accommodate
six
different
vent
and
combinations as shown on figure 3. Find a location on
an outside wall that respects all conditions stated in
part 2, section 2. An opening of 7.75" x 7.75" should
be provided in the wall for the vent terminal
installation.
combustion
air
pipe
2.4.2) Orientation
connection
The vent terminal is factory assembled with the vent
pipe and is ready for use if your application calls for
position # 1 or position # 4 as shown on figure 3. If the
position required for the application is position # 1 or #
4, go directly to section 2.4.3 of this chapter. If the
position required for the application is one of # 2, # 3,
# 5 or # 6 you should proceed using the following
instructions.
To meet a Horizontal Side connection for either
combustion air pipe or vent pipe you should
rotate the square tube 90
of your needs.
1. Take the outdoor flanged guard off in removing
the 8 stainless steel metal screws as identified "A"
(see figure 4);
2. Take the venturi assembly off in removing the 8
stainless steel metal screws as identified "B" (see
figure 4);
Note: 1- The cone diffuser and vent pipe assembly
stay together during this operation.
2- The slope direction of the outdoor end cone
diffuser should be down when the vent
terminal is installed.
3. Turn the square tubing on is position required;
4. Screw the venturi assembly (see note 2) on the
square tubing;
5. Screw the outdoor flange guard to the square
tubing section of the vent terminal and make sure
that the square opening of the guard is aligned
with the outdoor end cone diffuser.
of
the
flexible
o
CW or CCW depending
5