Download Print this page

Allen-Bradley 140G Installation page 2

Battery unit for electronic trip units
Hide thumbs Also See for 140G:

Advertisement

3
Connection examples
Use the mechanical adapter to properly align the battery unit with the trip unit. Refer to the figures above.
LSIG
PR331/P
LSIG-MM
PR332/P
4
Battery replacement
This product contains an alkaline battery which is intended to be replaced during the life of the product.
At the end of its life, the battery should be collected separately from any unsorted municipal waste.
Allen-Bradley, Rockwell Software, and Rockwell Automation are trademarks of Rockwell Automation, Inc.
Trademarks not belonging to Rockwell Automation are property of their respective companies.
Rockwell Automation maintains current product environmental compliance information on its website at http://www.rockwellautomation.com/rockwellautomation/about-us/
sustainability-ethics/product-environmental-compliance.page
Publication 140G-IN151C-MU-P - May 2016
LSIG:
LSIG-MM:
DIR 1000631R0001 Version 02 (L6826) - B0934
Copyright © 2016 Rockwell Automation, Inc. All Rights Reserved. Printed in Italy.

Advertisement

loading

This manual is also suitable for:

140g-n140g-ns140g-r