6.2

Connection of the control units

Electrical work must only be carried out by qualified electrical
contractors.
The terminal strip is located behind the cover.
▶ Unscrew the control panel and hang on the frame.
2x
Fig. 26 Mounting the user interface
▶ Turn the locks a quarter turn clockwise then remove the cover.
45°
Fig. 27 Removing the cover
▶ Connect the components to the relevant plug.
1
Fig. 28 Terminal strips
[1]
24 V AC terminal strip
[2]
230 V AC terminal strip
Condens 5000W – 6720813952 (2019/02)
0010010004-001
0010010005-001
2
0010010006-001
6.3

Installation of the strain relief

▶ Always pass the cable to be installed through a supplied strain relief
mechanism before attaching it to a mains plug.
▶ Trim the grommet of the strain relief according to the dimension of
the cable.
▶ Always pass the cable to be installed through a supplied strain relief
mechanism.
A
B
Fig. 29 Cable entry
▶ Fasten the corresponding plug to the cable.
▶ Plug the plug in at the terminal strip.
▶ Tighten the screw of the strain relief.
Fig. 30 Tightening the screw
Electrical connection
0010010007-001
0010010008-001
17