Pre-Start-up Inspection Checks
This inspection should be done prior to the
compressor test.
I. Check all assemblies, clamps, fittings, hose
connections, nuts, and bolts to ensure they are
properly tied and secured to the vehicle. This
is a very critical area of inspection. The
vehicle should not be moved until this
inspection has been completed.
II. Remove all tools, rags, and installation
equipment from the area.
III. Check all valves to ensure they are in correct
operating position.
IV. Vacuum all areas that have metal or plastic
shavings. Wipe all fingerprints off unit and
vehicle.
Check All Fluid Levels
Position the unit on a level surface so that proper
amount of fluids can be added.
I. Fuel to provide three hours of operation
II. Hydraulic fluid levels may have to be topped
off after test.
III. Compressor
A. Add oil if needed.
B. Additional oil may need to be added after
test.
C. Top off oil level to the "FULL" line on
the dipstick when finished with test.
II. Any other applicable fluids
III. Transmission fluid and PTO box.
Installation & Operation
Machine Documentation
Record all serial numbers for this installation.
A. Vehicle V.I.N.
_________________________________________
B. Hydraulic Pump Data
_________________________________________
C. Compressor Serial Number
_________________________________________
D. BOSS Serial Number
_________________________________________
E. Air Tank Serial Number
_________________________________________
F. Note any special applications relating to specific
installations.
_________________________________________
- 11 -
310969