PRIOR TO INSTALL

Ensure install location receives at least 2 to 3 hours of midday
sun on average. Please handle bollard with care as scratches
will affect appearance and powder coat durability.

PLB MODELS

Please refer to the diagram below to identify the model you are
installing. This is needed for step 4.
PLB ASYMMETRICAL
(PLB ASM)

1. INSTALL ANCHOR BOLTS

With a one to two foot setback from the path or area to be illuminated, install concrete footing with
supplied anchor bolts. Align anchor bolts to path as shown below using the supplied cardboard
template to hold the bolts in position.
First Light Technologies
Document 70-0003 27 April 2021
© Copyright First Light Technologies
INSTALL INSTRUCTIONS
PLB Series Solar Bollard
PLB SYMMETRICAL
(PLB SYM)
Path

TOOLS REQUIRED

• 5/32 inch hex key
• 3/4 inch wrench or deep socket
HEAD
POST
BASEPLATE
Anchor Bolts
Footing
Footing
www.firstlighttechnologies.com
info@firstlighttechnologies.com
Toll Free: 1 (844) 279-8754

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the PLB Series and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for First Light PLB Series

  • Page 1 INSTALL INSTRUCTIONS PLB Series Solar Bollard PRIOR TO INSTALL TOOLS REQUIRED Ensure install location receives at least 2 to 3 hours of midday • 5/32 inch hex key sun on average. Please handle bollard with care as scratches • 3/4 inch wrench or deep socket will affect appearance and powder coat durability.
  • Page 2 INSTALL INSTRUCTIONS PLB Series Solar Bollard 2. INSTALL BASEPLATE PLB ASM MODEL ONLY Ensure base plate is aligned to Remove the baseplate from the bottom of the bollard and path as shown. place it on the footing. Use supplied nuts to secure baseplate to footing and tighten to 45 ft-lbs.

This manual is also suitable for:

Plb asmPlb sym

Table of Contents