INSTALL INSTRUCTIONS PLB Series Solar Bollard PRIOR TO INSTALL TOOLS REQUIRED Ensure install location receives at least 2 to 3 hours of midday • 5/32 inch hex key sun on average. Please handle bollard with care as scratches • 3/4 inch wrench or deep socket will affect appearance and powder coat durability.
Page 2
INSTALL INSTRUCTIONS PLB Series Solar Bollard 2. INSTALL BASEPLATE PLB ASM MODEL ONLY Ensure base plate is aligned to Remove the baseplate from the bottom of the bollard and path as shown. place it on the footing. Use supplied nuts to secure baseplate to footing and tighten to 45 ft-lbs.