First Light PLB Series Manual

Solar powered led bollard

Advertisement

IMPORTANT: PLEASE READ THE FOLLOWING INSTRUCTIONS PRIOR TO INSTALLING PLB SERIES BOLLARD.
1. Install bollard in an area with good sun exposure.
2. Install (3) supplied anchor bolts
maximum of 1.75" above concrete surface.
3. Remove the mounting plate
and nuts
the mounting plate then secure in position by tightening the nuts.
4. Install pole
its' mounting hole, and then tighten.
5. Remove the head assembly
6. Remove the battery
7. Use the strap
8. Connect the battery harness to the connector
9. Once battery is connected, LED's will turn on for 1 minute. The unit is now functional.
10. Install the head assembly onto the pole and secure into place with (3) washers
and tighten evenly. For asymmetrical distribution ensure correct LED orientation as shown below.
11. Remove cardboard cover from head assembly.
First Light Technologies
479 John St.
Victoria, BC Canada
V8T 5H1
Document 70-0004 12.SEP.13
DO NOT REMOVE CARDBOARD FROM THE HEAD ASSEMBLY UNTIL PRODUCT IS CONNECTED AND
INSTALLED.
HANDLE WITH CARE, COATING IS A LONG LASTING FINISH, HOWEVER SCRATCHES OR DAMAGE TO
POWDER COAT WILL AFFECT PRODUCT APPEARANCE AND DURABILITY.
USE CAUTION WHEN HANDLING 6V 8AH BATTERY TO AVOID SHORT CIRCUITING THE TERMINALS.

INSTALLATION PROCEDURES

in concrete foundation using template provided. Ensure bolts project a
from the product and install onto anchor bolts positioning the washers
above and below the mounting plate as pictured in the diagram. Use these fasteners to level
over mounting plate and install (3) ¼-20 screws
(with cardboard cover attached) from the pole.
from product packaging.
to secure battery to the bracket.
SOLAR POWERED LED BOLLARD
loosely until each fastener is aligned to
on the back of the battery bracket.
Asymmetrical Option
© Copyright First Light Technologies Ltd.
PLB SERIES
and (3) ¼-20 bolts
www.FirstLightTechnologies.com
info@FirstLightTechonologies.com
250.590.5774
!

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the PLB Series and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for First Light PLB Series

  • Page 1 POWDER COAT WILL AFFECT PRODUCT APPEARANCE AND DURABILITY. USE CAUTION WHEN HANDLING 6V 8AH BATTERY TO AVOID SHORT CIRCUITING THE TERMINALS. IMPORTANT: PLEASE READ THE FOLLOWING INSTRUCTIONS PRIOR TO INSTALLING PLB SERIES BOLLARD. INSTALLATION PROCEDURES 1. Install bollard in an area with good sun exposure.
  • Page 2 Battery state of charge is lower than optimal state, install and the product should charge the battery. Monitor for correct operation. If complications persist, please contact customer service. First Light Technologies www.FirstLightTechnologies.com 479 John St. info@FirstLightTechonologies.com Victoria, BC Canada V8T 5H1 250.590.5774 Document 70-0004 12.SEP.13 © Copyright First Light Technologies Ltd.

Table of Contents