Installation; Preparation; Installation Procedure - Eurofred daitsu RHR-SCO2 User Manual

Table of Contents

Advertisement

DAITSU WIRELESS CO

5 INSTALLATION

5.1 PREPARATION

DANGER
Disconnect the power supply to the supply line,
circuit breaker or fuse before installing the de-
vice.

5.2 INSTALLATION PROCEDURE

DANGER
Make sure that the power supply is turned off.
I 8
PROBE / INSTALLATION AND OPERATION MANUAL
2
1. Press the clip and pull the
upper section of the lower
section.
When the device is not placed in a recessed wall box:
1. Prepare the wall, if necessary. Use the mounting plate as a template.
2. Remove the detachable plastic from the cable entry on the housing.
1. Pass the power cable
through the rear hole (A)
or the cable entry (B).
4. Connect the power cable
to the bolt terminals.
NOTE
Do not place the device in a metal housing.
2. Open the safety cover.
Use a small flat-head
screwdriver to loosen
the clip.
2. Position the lower section
of the device.
3. Secure the lower section
with the bolts.
5. Position the upper section
of the device on the lower
section.
a. Position the clips.
b. Close and press until
it clicks.

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rhr 150Rhr 200

Table of Contents