Maintenance; General; Test Set-Up; Calibration And Verification - EM TEST EFT 500 Series Manual For Operation

Eft/burst generator pulse 5/50ns
Table of Contents

Advertisement

EM TEST
5.

Maintenance

5.1.

General

The generator is absolutely maintenance-free by using a solid state semiconductor switch to generate transients.
5.2.

Test set-up

5.3.

Calibration and verification

The EM Test equipment are calibrated in the factory and marked with a
calibration-tag. The measuring instrument is traceable to the Swiss Federal
Office of Metrology.
The calibration date is marked. The validity of the calibration is in the area of
responsibility of the users quality system.
Please refer to the corresponding standard before proceed a calibration or verification. The standard describes
the procedure, the tolerances and the necessary auxiliary means. There are suitable calibrations adapters to use.
All calibrations and verifications are always without mains supply voltage on the impulse- or coupling network
output.
Danger
Manual for Operation
When setting up the test national and international regulations
regarding human safety have to be guaranteed.
It is recommended to connect the simulator to the ground reference
plane of the test set-up.
The generators of the series 500, UCS, VCS, CSS, TSS and CNI, can
be linked together to a fully automotive test set-up.
The set-up communicates via the IEEE / GPIB bus and is controlled by
ISMIEC software. For setting up the system see the following figures:
Each generator can be operated individual as a single equipment.
Before starting the calibration or verification
remove the EUT Mains Supply
from the generator and from the coupling network
V 2.00
EFT 500 Series
Example: EM Test calibration-tag
17 / 21

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents