Lutz-Jesco AIRTRAN LI20-FP Series Operation & Maintenance Instructions Manual

2” air operated double diaphragm pump

Advertisement

Quick Links

A measured step forward
TM
AIRTRAN
2" Air Operated Double Diaphragm Pump

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the AIRTRAN LI20-FP Series and is the answer not in the manual?

Questions and answers

Summary of Contents for Lutz-Jesco AIRTRAN LI20-FP Series

  • Page 1 A measured step forward AIRTRAN ™ 2” Air Operated Double Diaphragm Pump...
  • Page 2 THIS PAGE INTENTIONALLY LEFT BLANK P h o n e : ( 5 8 5 ) 4 2 6 - 0 9 9 0 www.lutzjescoamerica.com Fax: (585) 426-4025  ...
  • Page 3: Table Of Contents

    Table of Contents Warnings, Dangers and Cautions ......................4 Model Designation Matrix and Repair Kits - Bolted Plastic ..............5 Principles of Operation ..........................6 Dimensional Drawings ..........................7 2” Pump Dimensions - Bolted Plastic ...................... 7 Performance Curves ..........................8 Installation, Troubleshooting and Maintenance ..................
  • Page 4: Warnings, Dangers And Cautions

    Warnings, Dangers and Cautions Cautions — read first! READ THESE WARNINGS AND SAFETY PRECAUTIONS PRIOR TO INSTALLATION OR OPERATION. FAILURE TO = Hazards or unsafe practices WARNING COMPLY WITH THESE INSTRUCTIONS COULD RESULT IN which could result in severe PERSONAL INJURY AND OR PROPERTY DAMAGE. RETAIN personal injury, death or THESE INSTRUCTIONS FOR FUTURE REFERENCE.
  • Page 5: Model Designation Matrix And Repair Kits - Bolted Plastic

    Model Designation Matrix and Repair Kits - Bolted Plastic VALVE SEAT FLUID CONNECTION TYPE SPECIAL OPTION (HARDWARE MUFFLER, LUG) K = PVDF F = ANSI / DIN FLANGE P = Polypropylene 7 = Stainless Steel Hardware, Standard Muffler AIR SECTION 8 = Stainless Steel Hardware, Premium Muffler B = PTFE Coated Stainless Steel Hardware, Stan - P = Polypropylene Intermediate-Pneumatic Shift...
  • Page 6: Principles Of Operation

    Principles of Operation How an Air Operated Double Diaphragm Pump Works The air-valve directs pressurized air behind the diaphragm on the right, causing the diaphragm on the right to move outward (to the right). Since both the right diaphragm and the left diaphragm are connected via a diaphragm rod, when the right diaphragm moves to the right, the left dia- phragm (through the action of the diaphragm rod) moves to the right also.
  • Page 7: Dimensional Drawings

    Dimensional Drawings 2” Pump Dimensions - Bolted Plastic 1.9 [49] 23.6 [600] 31.7 28.7 [805] [729] 17.6 [446] 12.2 [310] [91] 0.6 [14] 13.7 [349] [153] [208] [234] [194] [101] 14.2 [360] 16.7 [423] Dimensions in inches (mm) P h o n e : ( 5 8 5 ) 4 2 6 - 0 9 9 0 www.lutzjescoamerica.com...
  • Page 8: Performance Curves

    Performance Curves Performance Specifications PERFORMANCE CURVE (2” RUBBER) Max. Flow: 160 gpm (605 lpm) PERFORMANCE CURVE (2'' RUBBER)* Max. Air Pressure: 120 psi (8.3 bar) DISCHARGE FLOW-Liters/Min. Max. Solids: ” (6.4 mm) (8,2) (83,9) Max. Suction Lift Dry: 17 ft-H O (5.2 m-H AIR CONSUMPTION (SCFM) (6,8)
  • Page 9: Installation, Troubleshooting And Maintenance

    Installation, Troubleshooting and Maintenance Installation Piping Ensure that the air supply is sufficient for the volume of air required by the pump. Refer to product specifi- Whenever possible ensure the pump is installed using the cations for further details. For reliable operation, install a 5 shortest possible pipe lengths with the minimum amount of micron air filter, air-valve and pressure regulator.
  • Page 10: Suggested Installation

    Suggested Installation This illustration is a generic representation of an air operated double-diaphragm pump. P h o n e : ( 5 8 5 ) 4 2 6 - 0 9 9 0 www.lutzjescoamerica.com Fax: (585) 426-4025  ...
  • Page 11: Troubleshooting

    Troubleshooting PROBLEM EFFECT/SOLUTION Pump Will Not Cycle Discharge line closed or plugged Discharge filter blocked Check valve stuck Air filter blocked Air supply valve closed Air supply hooked up to muffler side of pump Compressor not producing air or turned off Muffler iced or blinded Diaphragm ruptured Plant air supply line ruptured...
  • Page 12: Operation

    Operation Maintenance The Air-Operated Double Diaphragm Pump requires Due to the unique nature of each application, periodic inspec- a minimum of 20 psig of air to operate, with some variation tion of the pump is the best method to determine a proper according to diaphragm material.
  • Page 13: Repair And Assembly

    Repair and Assembly Pump Wet End Removal TOOLS NEEDED WARNING Prior to servicing the pump, ensure that the air and fluid lines are closed and disconnected. While wearing personal 1) Two Wrenches, 3/4 Inch protective equipment, flush and drain process liquid from the 2) Two Wrenches, 1 1/4 Inch pump.
  • Page 14: Pump Wet End Assembly

    STEP 7 STEP 8 STEP 9 In order to remove both “Outer Cham- Remove both “Outer Chambers” and Using two 1-1/4 inch wrenches, re- bers”, using two 3/4 inch wrenches “Power Rings” from the “Intermediate”. move “Outer Diaphragm Plate”, “Dia- (or socket), remove ten “Hex Head Cap Note the “Lock Washers”...
  • Page 15: Repair And Assembly

    Repair and Assembly Air Valve Removal TOOLS NEEDED WARNING Prior to servicing the pump, ensure that the air 1) One Wrench, Inch and fluid lines are closed and disconnected. While wearing personal protective equipment, flush and drain process liquid from the 2) One Pick, General Purpose pump.
  • Page 16: Air Valve Assembly

    STEP 7 STEP 8 STEP 9 Remove the “Air Valve Spool” from the Using the pick, remove the “Lip Seal Using the pick, remove the second “Lip main “Air-Valve Assembly”. Note: The (Air Valve)” from the main “Air-Valve As- Seal (Air Valve)” from the main “Air- longer piston with the boss is on the sembly”.
  • Page 17: Repair And Assembly

    Repair and Assembly Pilot Valve Removal TOOLS NEEDED WARNING Prior to servicing the pump, ensure that the air 1) One Screwdriver, Phillips #2 and fluid lines are closed and disconnected. While wearing personal protective equipment, flush and drain process liquid from the 2) Two Wrenches, 3/4 Inch pump.
  • Page 18: Torque Specification Chart

    Pilot Valve Assembly To assemble the pilot valve, reverse the order of disassembly. Should process flu- id have contact with the pilot valve O-Rings, they should be replaced as swelling may occur and cause irregular operation. During assembly, ensure that the open side of the lip-seals are facing outward.
  • Page 19: Exploded Views & Parts Lists

    Exploded Views & Parts Lists Exploded View - LI20-FP*-****-*** Bolted Plastic P h o n e : ( 5 8 5 ) 4 2 6 - 0 9 9 0 www.lutzjescoamerica.com Fax: (585) 426-4025  ...
  • Page 20: Parts List - Li20-Fp*-****-*** Bolted Plastic

    Parts list - LI20-FP*-****-*** Bolted Plastic ITEM DESCRIPTION QTY PUMP MODEL PART NO. DESCRIPTION QTY PUMP MODEL PART NO. MATERIAL DISCHARGE MANIFOLD LI20-FPP-****-*** 10596-40-AF Polypropylene LI20-FPK-****-*** 10596-56-AF PVDF BALL LI20-FP*-*V**-*** 11009-13 † Viton /FKM ® LI20-FP*-*E**-*** 11009-15 † EPDM LI20-FP*-*G**-*** 11009-19 †...
  • Page 21: Parts List - Li20-Fp*-****-*** Bolted Plastic (Cont.)

    Parts list - LI20-FP*-****-*** Bolted Plastic (cont.) DESCRIPTION QTY PUMP MODEL PART NO. MATERIAL LIP SEAL (Air Valve) ALL MODELS 12003-76 Nitrile ‡ O-RING (Valve Plug) ALL MODELS 11913-11 Nitrile ‡ AIR VALVE END PLUG ALL MODELS 11703-60 Polypropylene ‡ MUFFLER ALL MODELS 13001-00...
  • Page 22: Elastomers

    Elastomers Wetted Elastomers BUNA-N (NITRILE) GEOLAST® is a general purpose elastomer used with water and is an injection molded thermoplastic material with many oils. Temperature range 10°F to 180°F (-12C to characteristics similar to Nitrile. Has excellent 82C). abrasion resistance. Temperature range 10°F to 180°F (-12C to 82C).
  • Page 23 THIS PAGE INTENTIONALLY LEFT BLANK P h o n e : ( 5 8 5 ) 4 2 6 - 0 9 9 0 www.lutzjescoamerica.com Fax: (585) 426-4025  ...
  • Page 24 Total Fluid Management Lutz-JESCO is your reliable partner for all of your chemical feed applications. From the single metering or transfer pump to the complete chemical feed system, we provide you with the appro- priate Total Fluid Management solution. Please contact us for more information! Lutz-JESCO, Corp.

Table of Contents