Spinner BN A77150 Installation Manual

Advertisement

Installation guide for antenna
BN A77150

1 Introduction and safety advice

This instruction shall provide information how to install the antenna with mounting kits.
All shown tasks are intended to be carried out by qualified personnel only. Safety rules apply (e.g.
for working with heavy loads, radio frequency power signals or tools). In order to prevent damage
to equipment and humans, make sure that no RF power is present at the combiner during
installation.
Please note that satisfactory performance of the system (especially in terms of intermodulation)
can only be achieved if all jumper cables and connectors are handled properly. Please make sure
that all connectors are clean and free from metal dust or dirt. Avoid sharp bending of the
connecting jumper cables.
After carrying out all described steps, the antenna is ready for use. Make sure that the specified
environmental conditions for operation are not exceeded.
SPINNER does not guarantee for any faults or damage resulting from improper installation.
Data subject to change without notice – 16.06.2021(A)
SPINNER GmbH │ Erzgiessereistr. 33 │ 80335 München │ Germany │ www.spinner-group.com │ info@spinner-group.com

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the BN A77150 and is the answer not in the manual?

Questions and answers

Summary of Contents for Spinner BN A77150

  • Page 1 SPINNER does not guarantee for any faults or damage resulting from improper installation. Data subject to change without notice – 16.06.2021(A) SPINNER GmbH │ Erzgiessereistr. 33 │ 80335 München │ Germany │ www.spinner-group.com │ info@spinner-group.com...
  • Page 2 Secure the antenna on the pole with the mounting plate and mast bracket using the M5 nuts. Dimensions of Mast Bracket: ±2 59,5 ±2 Ø50 Data subject to change without notice – 16.06.2021(A) SPINNER GmbH │ Erzgiessereistr. 33 │ 80335 München │ Germany │ www.spinner-group.com │ info@spinner-group.com...
  • Page 3 Install the antenna upside down Step 1: Please prepare the materials and tools. Data subject to change without notice – 16.06.2021(A) SPINNER GmbH │ Erzgiessereistr. 33 │ 80335 München │ Germany │ www.spinner-group.com │ info@spinner-group.com...
  • Page 4 Step 2: Secure the antenna on the pole using the U type bolt and mast bracket. Step 3: Complete the installation by tightening the M5 nuts. Data subject to change without notice – 16.06.2021(A) SPINNER GmbH │ Erzgiessereistr. 33 │ 80335 München │ Germany │ www.spinner-group.com │ info@spinner-group.com...

Table of Contents