Test Operation And Debugging - Lennox VEPS075N432K User Manual

Dc inverter multi vrf system user manual
Table of Contents

Advertisement

DC Inverter Multi VRF System
Check items
Power cord meets the required specification?
Is the air inlet/outlet blocked?
Length of refrigerant pipe and the charging amount of
refrigerant are recorded or not?
Binding pieces on compressor feet are removed or
not?

5.2 Test Operation and Debugging

NOTES:
① After finishing the first installation or replacing the main board of outdoor unit, it is necessary to
perform test operation and debugging. Otherwise, unit won't be able to work.
② Test operation and debugging must be performed by professional technicians or under the
guidance of professional technicians.
5.2.1 Prepare the Test Operation and Debugging
(1) Do not connect power until all installation work is finished.
(2) All control circuits and wires are correctly and securely connected.
(3) Check whether the fixing loops for compressor foots are removed.
(4) All small pieces, especially metal chips, thread ends and forceps holder, must be removed from
the unit.
(5) Check whether unit's appearance and pipeline system has been damaged during
transportation.
(6) Calculate the quantity of refrigerant that needs to be added according to the pipe length.
Pre-charge the refrigerant. In case that the required charging quantity is not reached while
refrigerant can't be added, record the quantity of refrigerant that still needs to add and
complement the quantity during test operation. For details of adding refrigerant during test
operation, see below.
(7) After refrigerant is added, make sure valves of outdoor unit are completely open.
(8) For the convenience of troubleshooting during debugging, unit shall be connected to a PC with
applicable debugging software. Make sure unit's real-time data can be checked through this
computer. The installation and connection of debugging software can be found in the Service
Manual.
(9) Before test operation, make sure unit is power on and compressor has been preheated for
more than 8 hours. Touch the unit to check whether it's normally preheated. If yes, start test
operation. Otherwise, compressor might be damaged.
(10) If the LED digital tube on main board displays _ _ _ _, then input the startup password. For
operation details, please see the instructions for the function of startup password.
Possible conditions due to improper spallation
Unit may have malfunction or components may
get damaged.
Insufficient cooling (heating) capacity.
The refrigerant charging amount is not accurate.
Compressor may get damaged.
23
Check

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Veps096n432kVeps120n432k

Table of Contents