5pc all weather wicker set: 1 sofa and 2 ottoman (8 pages)
Summary of Contents for real living A101013211
Page 1
JEFFERIES 10X12 FT OCTAGON SOFT TOP GAZEBO ASSEMBLY INSTRUCTIONS ITEM#: A101013211 SKU# 810490385 Need help? We are here for you! 1(866)578 – 6569 24/7 • Toll Free...
GENERAL BEST PRACTICES FOR ASSEMBLY: • Please read and understand this entire manual before attempting to assemble or install the product. • Before beginning assembly of product, make sure all parts are present. Compare parts with package contents list and hardware contents list.
PARTS LIST Label Part Number Description Part Image P000200558 Top post P000200559 Bottom post 1 P000200560 Bottom post 2 Left long P000401084 screen Right long P000401085 screen P000401086 Short screen P000601864 Upper Beam P000601865 Beam P005700791 Adjust tube Big roof short P000601862 tube Big roof long...
HELPFUL HINTS • Tools needed and not included • Separating parts before starting Provided in hardware pack How many people needed for the installation work 5/19...
Page 6
STEP 1 Assembled View: Insert the Bottom post(A2/A3) to the Top post(A1),fixed with Bolt(AA) Flat washer(CC) by Wrench(Z1) 6/19...
Page 7
STEP 2 Assembled View: Fixed Short screen(C) to the Top post(A1) with Bolt(AA),Flat washer(CC) and Spring washer(DD), then fixed Panel(L2) to the Bottom post(A2/A3)with Bolt(BB) and Flat washer(CC) ,tighten by Wrench(Z1). 7/19...
Page 8
STEP 3 Assembled View: Fixed Left long screen(B1) to Right long screen(B2) with Bolt(GG),Flat washer(CC) Spring washer(DD) and Nut(HH), tighten by Wrench(Z1). 8/19...
Page 9
STEP 4 Assembled View: Fixed assembled Long screen (B1/B2) and Short screen(C) to the Top post(A1) with Bolt(AA),Flat washer(CC) and Spring washer(DD), tighten by Wrench(Z1). 9/19...
Page 10
STEP 5 Assembled View: Lock the Big roof short tube(E1),Big roof long tube(E2) and Big roof connection tube(F) with a snap. 10/19...
Page 11
STEP 6 Assembled View: Lock the Upper Beam(D1) and Beam(D2) with a snap, then lock Beam(D2) and Adjust tube(D3) with a snap. 11/19...
Page 12
STEP 7 Assembled View: Lock Upper Beam(D1) and Big roof connection tube(F) with a snap, then insert the Beam(D2) to Top post(A1) 12/19...
Page 13
STEP 8 Assembled View: Spread the Big roof canopy(N) to big roof, do not tighten the canopy first. 13/19...
Page 14
STEP 9 Assembled View: Lock Small roof beam(G) and Small roof connection tube(H) with a snap. 14/19...
Page 15
STEP 10 Assembled View: Spread Small roof canopy(M) to the Small roof beam(G), tighten it 15/19...
Page 16
STEP 11 Assembled View: Attach the assembled small roof on the big roof, Lock Small roof beam(G) and Big roof connection tube(F) with a snap, then attach the Hook(I) to Small roof connection tube(H). 16/19...
Page 17
STEP 12 Assembled View: Attach the Big roof canopy(N)'s corner (without belt) to Adjust tube(D3),then attach the final canopy corner(with belt) to Adjust tube(D3),tighten them. 17/19...
Page 18
STEP 13 Please do the matching of zippers for different panels as showing the picture Assembled View: Hang the mosquito(O) to netting tube with Ring(FF). Tie the netting to post with a bandage. 18/19...
Page 19
STEP 14 Assembled View: Fix the Bottom post(A2/A3) to the ground by Stake(EE) 19/19...