Download Print this page

Toshiba RBC-TWP30E2 Installation Manual page 13

Hide thumbs Also See for RBC-TWP30E2:

Advertisement

5
PIPING THERMAL INSULATION
Thermal insulation was produced locally.
Be certain to thermally insulate the piping both on the liquid and gas sides.
• Use thermal insulating materials for piping higher than 120 degree in heat resistance.
Example: EPT - Ethylene, propylene, terpolymer
• Thermally insulate the branch pipe sections using fitting covers (for tees) more than 10mm in thickness or processing thermal
insulation materials as follows.
(Thermal insulation materials for the branch pipes are not supplied as accessories.)
• Seal the branch pipe sections tightly without producing gaps
Thermally insulated pipe of main piping
Seal with vinyl tape
Cut 90°
6
TEST RUN
Be certain to conduct a test run in accordance with the procedures contained in the operating and installation instructions
supplied with the indoor units.
7
DELIVERY TO CUSTOMER
• Make certain to hand over the instruction manual supplied with the indoor units to the customer.
• Deliver the system after thoroughly explaining the contents of the instruction manual.
It is important to explain to the customer in details about simultaneously starting and stopping the two indoor units by
operating one remote controller switch.
Seal seams using foamed urethane or
a similar material
Thermally insulated pipe of piping
Thermally insulated material
Outside diameter of thermally insulated pipe of branch piping
90° notch
100mm or more
10

Advertisement

loading

This manual is also suitable for:

Rbc-twp50e2