Installation (Horizontal) - LG LP1419IVSM Owner's Manual

Hide thumbs Also See for LP1419IVSM:
Table of Contents

Advertisement

INSTALLATION (HORIZONTAL)

1 Attaching Foam Weather Seals
Cut the mounting plate insulation to the chassis length and insert it on both sides of the
mounting plate.
(Attaching the foam weather seals to the panel assembly rather than the window sash and
frame makes for easier cleanup when removing the panel assembly.)
• NOTE : Take care not to block drain holes in the exterior sill. If necessary,
cut slots in the foam seal to allow any moisture to drain out the window sill drains.
Indoor
Interlor
2 Inserting Panel Assembly
Insert the panel assembly in the bottom sash channel as in step 2. Use care when installing the assembly, which will
now fit very tightly in the opening.
Close the sash tightly against the top of the panel assembly. For a tighter seal, use "no residue" duct tape (not
included) to seal any gaps around the installed panel assembly.
• If needed, install the included security bracket with a bracket screws.
Base mounting
plate
3 Sealing Gap between Sashes
Measure and cut the included window gap insulation to fit the window opening. Stuff it between the window sashes to
prevent air and insects from getting into the room.
Tip: For a tighter seal, use "no residue" duct tape to seal the gap between the sashes.
Mounting
Mounting
plate insulation
plate insulation
Extension
panel
Bracket screws
Indoor
Interlor
Mounting plate insulation
Security
brackets

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents